My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 12:12:24 PM
Creation date
9/3/2020 11:55:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By : X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : X Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Pressure Gauges in Psi/Nitrogen Equipment Resolution : 1 / 10- 15 Psi <br /> , w <br /> Piping Run #1 Piping Run #2 Piping Run #3 Piping Run # <br /> Piping Material : Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: 3 " 3 " 3 " <br /> Length of Piping Run : Approx. 90 ' Approx. 40 ' Approx. 100 ' <br /> Product Stored : Super 91 Diesel Regular 87 <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation : Piping Sump # 1 Piping Sumps #2 Piping Sump 93 <br /> Wait time between applying 5 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time : 1 : 05 1 : 10 1 : 15 <br /> Initial Reading (Rj) : 5 Psi 5 Psi 5 Psi <br /> Test End Time : 2 : 05 2 : 10 2 : 15 <br /> Final Reading (RF) : 5 Psi 5 Psi 5 Psi <br /> Test Duration : 1 Hour 1 Hour 1 Hour <br /> Change in Reading (RF-RI) : 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments — (include information on repairs made prior to testing, and recommended follow-zrp for failed tests) <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.