Laserfiche WebLink
P4U'" \ SAN J O A Q U I N Environmental Health Department <br /> COUNTY Linda Turkatte , REHS , Director <br /> Kasey Foley, REHS, Assistant Director <br /> c?tiFo+ Greatness grows here . <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Michael Kith , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> June 20 , 2019 <br /> BONNIE GARBER <br /> DONLEE PUMP COMPANY . <br /> 2825 RAIL ROAD AVE <br /> CERES , CA 95307 <br /> Re . VAN DE POL ENTERPRISES INC <br /> 816 E FRONTAGE RD SR0080338 <br /> RIPON , CA 95366 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the <br /> review of the application for a permit to replace drop tubes on the 87 , 91 unleaded gasoline <br /> and Diesel tanks with defender series overfill prevention drop tube valves (708592902 ) and <br /> reinstall outer spill buckets U -shaped seal ( 85000 ) on the underground storage tank ( UST) <br /> system at the above noted address , The permit has been approved with the following <br /> conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work . All new addenda supersede the previous ones . <br /> 3 . Contact Paul Nso at (209 ) 468-3432 to arrange the following appointments ( a 48- hour <br /> notice is required for inspection appointments ) . <br /> • Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume <br /> shut off. <br /> • Spill bucket test : Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br /> test (equivalent) , Proper drainage must also be verified . <br /> Please be aware that the facility cannot receive fuel in the tanks prior to the EHD <br /> N <br /> nspection and approval . <br /> 4 . If concrete will be broken near the tank , a secondary containment test must be <br /> performed on the tank once concrete is poured in accordance with the manufacturer' s <br /> guidelines . <br /> 5 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br />