POMECO Multi -Port Spill Container Manhole <br /> Installation Instructions 3 . Remove the cover and measure the distance <br /> from the top of the tanks to the final grade . <br /> 1 . Mark off finish grade . (See Figure 1 . ) <br /> 4 . Cut the riser(s) from the underground tank so <br /> Finish Grade that both the fill and vapor risers are set below <br /> the final grade . Use the dimensions below : <br /> Spill Container Inches below grade ( L) <br /> 5 Gal . Cast Iron Base 15 '/2" <br /> Figure 1 5 Gal , Composite Base 171/2 <br /> 7 . 5 Gal . Cast Iron Base 19 /2 <br /> 7 . 5 Gal , Composite Base 21 '/2" <br /> 2 . Set multi -port manhole assembly (skirt , ring , and Note : Add an extra 3414 " when using an OPW <br /> cover) to the final grade position . (See Figure FSA400 Face Seal Adaptor. (See Figure 2.) <br /> 2 . ) <br /> 5 . Deburr and thoroughly clean riser pipe (s ) . <br /> Finish Grade 6 . Apply pipe dope to riser(s) . The pipe dope is to <br /> be a non-hardening , gasoline resistant , pipe <br /> thread seal compound . <br /> 7 . Install OPW FSA-400 Face Seal Adapter onto <br /> riser. ( Recommend Torque , 4 " NPT , 125 ft4s <br /> min . to 250 ft4s max . ) . Apply pipe dope to <br /> FSA400 . The pipe dope is to be a non - <br /> hardening , gasoline resistant , pipe thread seal <br /> compound . This is optional for spill containers <br /> that are on the vapor lines . <br /> 8 . Thread the spill containers on hand tight . <br /> Note : Do NOT attempt to completely tighten the <br /> Figure 2 containment bucket by using the containment <br /> bucket mounting ring at the top of the bucket . <br /> Note : It is strongly recommended that POMECO 9 . Inspect the containment bucket gasket (s ) and <br /> covers be installed with the following minimum the ring gasket for damage . Replace the <br /> clearances . Sheet metal skirts should have gasket(s ) if they are damaged . <br /> adequate clearance between the tank sump riser 10 . Apply an even bead of PISCES SL- 1100 to the <br /> sidewall and or the sump top hat. A minimum of topside of the containment bucket gasket (s) . <br /> one and a half inches clearance on all sides is (See Figure 4 . ) <br /> recommended between the POMECO skirt and <br /> the tank sump wall or the sump top hat wall . A ; 4ontCahunent <br /> SL- 1100 <br /> minimum of two inches clearance is recommended between the bottom of theinaPOMECO skirt and the horizontal surface of the � asket <br /> tank sump or sump top hat. These clearances <br /> are recommended to allow adequate water <br /> migration away from the sumps . Great careshould be used to maintain the recommended <br /> clearances when setting the rings and pouring Bucket <br /> the concrete. ( See Figure 3 . ) Gasket <br /> Figure 4 <br /> 1 '/z Min 11 . Apply an even bead of PISCES SL- 1100 to the <br /> topside of the ring gasket . (See Figure 4 . ) <br /> 12 . Replace the multi-port cover, centering the <br /> riser(s) as close as possible in the containment <br /> openings . Be very careful not to move or <br /> damage the gaskets . <br /> Figure 3 <br /> POMECO Multi port Spill Container Page 2 <br />