My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 1:47:25 PM
Creation date
9/3/2020 1:26:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,leak Detection and Secondary Containment Equipment at UST Facilities <br /> sibility of accidentally imposing a high vacuum TABLE 4-1 <br /> that could damage the tank.The use of the valve Test Parameters <br /> is recommended because it limits the vacuum <br /> �. that can be applied to the interstitial space.); Tank ! vacuum, Capacity, Duration, <br /> TypeInches Hg gallons hours <br /> • vacuum gauge with a range of 0 inches to 30 <20.000 <br /> inches Hg graduated in increments of 0.5 inches Fiberglass 10 - <br /> Hg or less: 20,000+ 2 <br /> <20.000 1 <br /> • toggle valve and vacuum hose: Steel 6 <br /> 20,000+ 2 <br /> • stopwatch or other time-measurement device <br /> capable of measuring a I-second increment; <br /> 4.2.9 Pass/Fail Criteria. if there is no loss in <br /> • plumber's plug. vacuum level, no liquids are drawn into the inter- <br /> 4.2.8 Test Procedure. stitial space during the test duration shown in Table <br /> 4.1, and the tank secondary containment area has <br /> 1. Install the plumber's plug in the interstitial no additional fluid than at the start of the test,then <br /> riser(s)below any tees. the tank secondary containment passes the test. <br /> 2. Connect the vacuum gauge, valve and the If there is any vacuum lost during the test or liquids <br /> vacuum-generating device to the fitting on the are drawn into the interstitial space, then the tank <br /> plumber's plug. The valve should be between secondary containment fails the test. <br /> the vacuum source inlet and the pressure <br /> gauge.The gauge should be between the valve 4.3 Tank Secondary Containment Integrity Testing <br /> and the fitting so it will read the interstitial vac- — Liquid-Filled Test Method. <br /> uum when the valve is closed. The automatic <br /> vacuum shutoff valve is located at the inlet of 4.3.1 General. This test method tests the integ- <br /> the vacuum-producing device and should be city of the liquid-filled interstitial space.There are a <br /> at a minimum of 10 percent and no more number of variables that affect this test,such as inter- <br /> than 2 inches Hg above the test vacuum. stitial space volume, temperature, water table and <br /> product level in the primary tank.Refer to Appendix <br /> 3. Ensure all connections are airtight. A for specific manufacturers'test procedures. <br /> 4. Start the vacuum-generating device, and open 4.3.2 Purpose. This general method is used to <br /> the valve. <br /> test the integrity of the liquid-filled secondary con- <br /> 5. Pull the vacuum to 10 inches Hg for fiberglass tainment of a UST. <br /> tanks and h inches Hg for steel tanks.Close the <br /> valve. 4.3.3 Description of Test. Liquid is added to <br /> the interstitial space of the tank and the level is <br /> 6. Allow the vacuum to stabilize for a minimum brought up into the interstitial riser.The liquid level <br /> of 5 minutes at the specified vacuum level. If is monitored for a specified period of time. If the <br /> a stable vacuum cannot be maintained, test liquid level is maintained, then the containment <br /> equipment shall be inspected for leakage. system has passed the test_ <br /> Repeat steps 4 and 5 until a stable vacuum is <br /> achieved. If a stable vacuum cannot be main- 4.3.4 Test Contfktons. The primary contain- <br /> tained., the tank secondary containment integ- ment may contain any level of product. Determine <br /> rity test fails. whether the groundwater depth is above the bottom <br /> 7. When the vacuum level stabilizes, record the of the tank:.Consult specific manufacturer's proce- <br /> vacuum level and the test start time. dures in regards to groundwater and performing the <br /> test. No bulk deliveries shall occur within 8 hours <br /> S. Observe the vacuum level for the period of prior to conducting or during the test. No dispens- <br /> time shown in Table 4-1. ing may occur during the duration of the test. <br /> 9. Record the final time and vacuum level. 4.3.5 Preparation. Determine the volume of <br /> 10.Check the interstitial space for accumulation of the tank and identify the gest being performed. <br /> liquids. Tank volume information is available from facility <br /> pei.org 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.