My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082410
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13550
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0082410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:04 PM
Creation date
9/3/2020 2:37:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0082410
PE
4231
FACILITY_NAME
13550 HWY 12
STREET_NUMBER
13550
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05502002
ENTERED_DATE
7/31/2020 12:00:00 AM
SITE_LOCATION
13550 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX E <br /> INSTALLING TANKS(See sections 5 and 7) TANK#1 TANK#2 TANK#3 TANK#4 <br /> Record tank diameter measurement#1 (before installation) <br /> Record final backfill bedding depth under tank-inches or centimeters <br /> Record final tank spacing between tanks-inches or centimeters <br /> Record final tank spacing from tank endcap to excavation walls- <br /> inches or centimeters <br /> If applicable,deadmen used-factory-supplied or other <br /> If applicable,anchoring hardware-factory-supplied or other <br /> Record diameter measurement#2(after straps are installed) <br /> Subtract diameter measurement#2 from#1 and record <br /> Deflection measurement meets Table 1-6 requirements-yes or no <br /> Voids under tank between ribs and under domes filled with backfill <br /> and tamped-yes or no <br /> Backfill placement and compaction meet requirements-yes or no <br /> Piping connections meet requirements-yes or no <br /> Fittings and other metal components are coated for corrosion <br /> protection-yes or no <br /> Record diameter measurement#3(after backfilling to top of tank is <br /> complete) <br /> Subtract diameter measurement#3 from#1 and record <br /> Deflection measurement meets Table 1-6 requirements-yes or no <br /> Tank was ballasted prior to bringing backfill to top of tank-yes or no <br /> After backfilling is broughtto top of tank(See sections 5,6 and 8) <br /> Tank was ballasted after bringing backfill to top of tank-yes or no <br /> Postinstallation tests were conducted for pressure-testable tanks- <br /> yes or no <br /> If applicable,optional hydrostatic test was performed-yes or no <br /> If applicable,containment sump test was successful-yes or no <br /> Record final depth of backfill over tank-give in inches or centimeters <br /> Record diameter measurement#4(after backfilling is brought to <br /> subgrade) <br /> Subract diameter measurement#4 from#1 and record <br /> Final deflection measurement meets requirements of Table 1.6- <br /> yes or no <br /> If applicable,type of surface pad used-concrete or asphalt <br /> If applicable,thickness of surface pad used-give in inches or <br /> centimeters and note which type <br /> If applicable,record monitoring fluid level when backfilling&top slab <br /> installation are complete <br /> 46 ZCL XERXES <br />
The URL can be used to link to this page
Your browser does not support the video tag.