My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082410
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13550
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0082410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:04 PM
Creation date
9/3/2020 2:37:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0082410
PE
4231
FACILITY_NAME
13550 HWY 12
STREET_NUMBER
13550
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05502002
ENTERED_DATE
7/31/2020 12:00:00 AM
SITE_LOCATION
13550 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GRINDSTONE JOE'S WATER SYSTEM DESIGN CALCULATIONS 2414-001 <br /> WATER SYSTEM DEMANDS DURING SEASONAL SITE USAGE(Mar.-Oct.) 10/16/201 <br /> INPUT DATA,CONSTANT <br /> OCCUPANCY DATA WATER USE <br /> VG ACTIVE SEASON WEEKEND USE(ATTENDEES/DAY) 8 EST.USFS CAMPGROUND TYPICAL OVERNIGHT WATER USE(Gal/Capita/Day) 40 <br /> PEAK DAY USE(ATTENDEES/DAY)") 85 EST.USFS CAMP DAY USE EST.(Gal/Capita/Day) 20 <br /> AY USE EST.(%OF FLOW) 75% <br /> VERNIGHT USE EST.(%OF FLOW) 25% <br /> FIXTURE COUNT BOOSTER PUMP 8 DISTRIBUTION SYSTEM <br /> UNIT DEMAND No.FIXTURES BOOSTER PUMP MINIMUM CAPACITY(GPM) 41.5 <br /> WATER CLOSETS 8.0 5 <br /> ROWERS 2.0 4 <br /> INKS 3.0 6 <br /> OSE BIBBS 1.1 23 <br /> ICE MAKER/DRINKING FOUNTAIN 0.5 1 <br /> TOTAL UNITS 92 <br /> (1) Peak Day Use estimated for the annual 6 hour member meeting at 20 gal/capita/day,adjusted to the 6 hour time-period. <br /> CALCULATIONS <br /> ALCULATION DESIGN VALUE Notes <br /> Per I Staff: Peak day is annual member picnic that only lasts 6 hours. <br /> CAPACITY-RELATED CALCULATIONS VALUES <br /> PEAK FIXTURE DEMAND per CPC(GPM) 42 <br /> AVERAGE DAY DEMAND(GPD) 320.0 <br /> PEAK DAY DEMAND(GPD) 531 <br /> WASTEWATER HOLDING TANK RELATED CALCULATIONS <br /> x PEAK DAY CAPACITY(GAL/WEEK) 3.750 <br /> RECOMMENDED MIN.CAPACITY(GAL) 4.500 <br /> TANK DESIGN CAPACITY(GAL) 5.000 / n <br /> PERATIONAL PUMPING RELATED CALCULATIONS 1 Lu�X <br /> 'TIME TO PUMP"CAPACITY,80%(GAL) 4.000 l 0 <br /> DAYS BETWEEN"TIME TO PUMP"PUMPING EVENTS(DAYS) 13j <br /> 'EXCEEDING RESERVE STORAGE'CAPACITY,96%(GAL) 4.800 vi, �[ <br /> DAYS BETWEEN"TIME TO PUMP"AND"EXCEEDING RESERVE STORAGE VOLUME"PUMPING EVENTS(DAYS) 300 <br /> s�bm <br />
The URL can be used to link to this page
Your browser does not support the video tag.