My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082410
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13550
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0082410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:04 PM
Creation date
9/3/2020 2:37:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0082410
PE
4231
FACILITY_NAME
13550 HWY 12
STREET_NUMBER
13550
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05502002
ENTERED_DATE
7/31/2020 12:00:00 AM
SITE_LOCATION
13550 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Manual and Operating <br /> Guidelines for Fiberglass Underground <br /> Storage Tanks <br /> READ BEFORE INSTALLING TANK • Preparing the Tank for Pressure Testing................. . 16-17 <br /> • Pressurizing the PrimaryTank..............................17 <br /> Read all instructions,supplemental materials • Pressurizing the Interstitial Space in a DryTank...............17 <br /> and operating guidelines before installation. • Soaping theTank.................................... 17-18 <br /> • Performing Visual Checks on a Tank <br /> Compliance with the installation instructions and operating with Wet Interstitial Space ................................18 <br /> guidelines contained in this Installation Manual and Operating • Releasing Pressure From the Tank..........................18 <br /> Guidelines(subsequently referred to as the Installation Manual)are nec- • Testing for Specific Types of Pressure-Testable Tanks.......18-20 <br /> essary for the proper installation,maintenance and use of our tanks and • Pressure-Testing Sidebar..................................19 <br /> accessories.For proper installation of some tanks and accessories,it may 5: Installing Tanks .... .. . ................ 20-23 <br /> also be necessary to consult select supplemental materials referenced in • General ...............................................20 <br /> the Introduction. • Dry Hole Installation .................................20-21 <br /> Failure to comply will void our obligations under the applicable • Wet Hole Installation....................................22 <br /> limited warranty forthe tank(s)and could result in death,serious • Bottom Sumps and Fittings ..............................22 <br /> injury,property damage ortank failure. • Ballasting Tanks(Adding Liquid)......................22-23 <br /> To Installer 6: Postinstallation Testing. . .. . . .. ... .... . . ... 23 <br /> Before installation,read and understand the Installation Manual and • Pressure Testing Tanks...................................23 <br /> any applicable supplemental materials.After tank installation,deliver • Optional Hydrostatic Testing..............................23 <br /> the Installation Manual with the completed Tank Installation Checklist 7: Piping,Venting and Containment Sumps. . . 23-25 <br /> (Appendix E)to the tank owner. • Internal Piping.........................................23 <br /> To Owner • External Piping.........................................23 <br /> After installation,retain the limited warranty,the Installation Manual • Venting Tanks..........................................23 <br /> and checklist for future reference and follow all operating guidelines in • Piping Sidebar.........................................24 <br /> the Installation Manual. • Venting Interstitial Spaces ...............................25 <br /> • Installing Containment Sumps ...........................25 <br /> 8: Completing Installation ............... . 26-27 <br /> TABLE OF CONTENTS • Taking Diameter Measure#4.............................26 <br /> • Monitoring Tanks.......................................26 <br /> Glossary. . .. . . . . .. ....... . .... . . . . .. .... . . . 02 • Monitoring Single-Wall Tanks ............................26 <br /> Introduction................. ... . .... ... . 03-04 • Monitoring Double-Wall Tanks............................26 <br /> • Use of Tank Data Charts..................................03 • Monitoring Double-Wall Tank With a Dry Interstitial Space....26 <br /> • Supplemental Materials.................................04 • Monitoring Double-Wall Tank With a Wet Interstitial Space....26 <br /> • Limited Warranties......................................04 • Setting the Level of the Monitoring Fluid...............26-27 <br /> I: Planning for Installation........ ......... 04-14 9: Operating Guidelines . . .... . ......... . . 27-28 <br /> • General .................... 04-05 04 • General...............................................27 <br /> • Backfill Material and Geotextile.......................04 <br /> ...................... . Temperature Limits for Stored Products and Materials........27 <br /> . Entering Tanks ......... <br /> • Excavation Requirements.............................05-14 .........................................27 <br /> • Filling Tanks(In General).................................28 <br /> 2: Handling and Storing Tanks. . . . . .... ... . . .14-15 . Filling UL-Labeled/ULC-Labeled Tanks......................28 <br /> • General ................................................14 10: Document Review ..... . ... . . . . . ..... .... 28 <br /> • Unloading,Hoisting and Guiding Tanks................. 14-15 <br /> • Storing Tanks ...........................................15 • Installation Manual.....................................28 <br /> 3: Preinstallation Inspection and Testing .. . ...15-16 • Appendices............................................28 <br /> ..............................................15 Appendices AI-A4.. ... . . . . . .. . .... ..... . . 29-35 <br /> • General .. <br /> • Inspectingthe...... k ......................................15 Appendices BI-B4.... . . . . . ... . ..... .... . . 36-42 <br /> 4: Testing During Installation.............. . 16-20 Appendix C . . . . . ... . . . . ... ... . .. .. . . .. . . . . . 43 <br /> • Tanks Types............................................ .I6 Appendix D. . . . . . . . . . . .... ... . . . . . . . ... 44 <br /> PP <br /> Appendix E . . 45-47 <br /> • Pressure-Test Pretesting Procedures ........................I6 <br /> 04.01.18 ZCLa XERXES' <br />
The URL can be used to link to this page
Your browser does not support the video tag.