Laserfiche WebLink
to anchor points,and the two strap halves are connected to each other 1.3.7.3.2.The particular configuration of hardware will be determined <br /> at the top of the tank.See Figure 1.5. by the contractor,the owner or the owner's representative,but is to adhere <br /> 1.3.7.2.11.MOH anchor straps are to be installed in the following way: to the following: <br /> Anchoring hardware must be manufactured to industry standards <br /> ure 1-5 and dimensions,and sized according to Table 1.3. <br /> _ _ • All exposed metal on the anchoring system must be coated <br /> IIII- Load Binder Strap Tee IIIII=IIIII or galvanized to protect against corrosion. <br /> III II—IIIII Assembly I—IIIII • If the hardware used isnot provided by us,contact the hardware <br /> IIIII—I IIIII—IIIII manufacturer or supplier forspecific information on hardware and its use. <br /> IIIII=IIIII II=IIIII - <br /> IIIII-II MOH IIIII-IIIII Minimum Turnbuckle <br /> IIIII—IIIII Strap III—IIIII Tank Diameter(by Type) <br /> Minimum Wire <br /> Diameter <br /> ILII—III IIIII—IIIII Hook Jaw Eye Rope Diameter <br /> IIIII=IIIII IIII=IIIII afoot 3/4u 'h1' �h" _3/811 <br /> IIIII-1111 ;z� bead'man IIIII=IIIII „ „ „ <br /> ° e <br /> 6-foot 3/4 1/2 1 1/2 3/8 <br /> — — — — —IhIll—M11111E=E9 <br /> 8-foot 3/a" 3/4" <br /> • Iiftthe strap with the hook end down and the hook facing away fro m the tank - <br /> • lower the hook end of the strap between the tank and the anchor 10-foot 11/4" 3/a" 3/a" 1h" <br /> point,and hook the strap to the anchor point12 foot 1/a" 3/a" 3/4" <br /> • put a washer and a blind nut(acorn nut)on one end of the threaded rod. <br /> • Feed the rod through the hole in the strap-end connector 1.3.7.3.3.When D-ring/D-ring straps are shipped and turnbuckles <br /> • put a washer and a nut on the other end of the threaded rod are ordered from us,we may ship extra hardware that may or may not <br /> • centerthe wear plate on the top center line of the marked ribs be necessary with alternate deadmen placement. <br /> • lowerthe threaded rod,washer and nut into the channel section 1.3.7.3.4.Locate the anchor points as shown in Figure 1-6 and <br /> on the strap-end connector,taking care to place the washer and Table 1-4.Refer to dimensions in Table 1.4.Align(within a tolerance <br /> nut on the outside of the connector <br /> • hand-tighten the nuts of±1 inch)all anchor points. <br /> 1.3.7.2.12.Repeat the bulleted items in 1.3.7.2.12 for the second <br /> rod of the assembly. IIIII=IIIII ` I=IIIII <br /> 1.3.7.2.13.After the two threaded rods are placed,tighten the threaded IIIII=I IIIII—IIIII <br /> rods,using a torque wrench to tighten to 25.30 foot-pounds,or until snug. IIIII=IIIII I I=IIII <br /> 1.3.7.2.14.Repeat the bulleted items in 1.3.7.2.12 for each of the load <br /> binder assemblies. 1111114111 _____ <br /> IIIII=IIIII � III=IIIII <br /> 1.3.7.3. HARDWARE AND ANCHOR POINTS IIIII—III IIIII—IIIII <br /> 1.3.7.3.1.When our anchoring hardware is not being used,the installing IIIII—IIIII 8 D A IIII=IIII <br /> contractor is responsible for providing hardware and anchor pointsIIIII-IIII •°' • • IIIII-IIIII <br /> of sufficient size and strength forthe tank being installed. 12" Deadman IIII =IIIII <br /> Nominal Tank Diameter A:Strap Eye g:Alternate Dimension C:Strap Length D:Center of Tank <br /> To Anchor Point to Center of Deadmen <br /> 4-foot 10"[25 cm] not reccommended 100"[254 cm] 31"[79 cm] <br /> 6-foot 23"[58 cm] not reccommended 145"[368 cm] 43"[111 cm] <br /> 8-foot(Red Tank) 29"[74 cm] 17"[43 cm] 181"[460 cm] 53"[135 cm] <br /> 8-foot(Green Tank) 30"[76 cm] 18"[46 cm] 195"[495 cm] 57"[145 cm] <br /> 10-foot(Red Tank) 38"[97 cm] 26"[66 cm] 236"[600 cm] 70"[178 cm] <br /> 10-foot(Green Tank) 39"[100 cm] 27"[69 cm] 236"[600 cm] 71"[180 cm] <br /> 12-foot 46"[117 cm] 34"[86 cm] 271"[688 cm] 88"[224 cm] <br /> 10 <br />