Laserfiche WebLink
5.3.WET-HOLE INSTALLATION 5.4.1.2.When installing a large bottom sump in a water or wastewater <br /> 5.3.1.Follow the dry-hole installation instructions(in section 5.2) tank,see the Large Bottom Sump Installation Instructions supplement. <br /> with the modifications listed. See the Introduction for details on where to obtain this supplement. <br /> 5.3.2. Perform points 5.2.1 through 5.2.4 of the dry-hole NOTICE <br /> installation instructions. All connections to the tank must be flexible.Provisions must be <br /> made to accommodate movement and misalignment between <br /> 5.3.3. Before performing point 5.2.5 of the dry-hole installation the piping and the tank.Failure to do this could result in damage <br /> instructions,pump waterfrom the excavation hole and continue pumping to the tank and/or surrounding property. <br /> to maintain minimum water level during tank installation. 5.4.1.3.While preparing the backfill bedding,dig a hole in the bottom of <br /> • Attempt to maintain the water level below the top of the bedding the excavation that is large enough to accommodatethe bottom sump orfitting. <br /> materials until the tank can be fully backfilled and ballasted. <br /> 5.3.4.Proceed with points 5.2.5 through 5.2.9 of the dry-hole 5.4.1.4.When installing a UL-or ULC-label tank equipped with a bottom <br /> installation instructions. sump,excavation and bedding must be modified to provide a 12-inch-deep <br /> [30-cm-deep]by 24-i nch-dia meter[61-cm-diameter]hole centered at the <br /> 5.3.5.Proceed with points 5.2.10 through 5.2.12 of the dry-hole sump location. <br /> installation instructions. 5.4.1.5.The required 12 inches[30 cm]of backfill bedding on the bottom <br /> 5.3.6.In high-water conditions,where it is not possible to maintain of the excavation must also be present in the excavation hole in which the <br /> the water level below the top of the bedding material during the bottom sump orfitting will be placed. <br /> entire installation,partially ballast the tank to firmly seat the tank 5.4.1.6.After the tank is placed,manually tamp backfill in the <br /> into the bedding material and to keep it from floating.See section 5.5 void surrounding the sump priorto adding backfill around the tank. <br /> for instructions. <br /> 5.3.7.The ballast level in the tank must either be lower than the 5.5.BALLASTING TANKS(ADDING LIQUID) <br /> backfill material or less than 12 inches[30 cm]above the water level A WARNING <br /> in the hole.See Figure 5-2. Inert the tank and use inert gases(not air)to pressure test a tank <br /> that contains or has contained flammable or combustible liquids <br /> Figure 5-2 orvapors.Failure to follow this warning could result in an explosion, <br /> Liquid in tank mugst not be more than = and could result in death or serious injury. <br /> VIII_VIII 12 excavation hole during nst Ilationherthan water in the VIII=VIII A WARNING <br /> —VIII= —VIII If flammable or combustible product is used as ballast,exercise <br /> VIII-VIII VIII-VIII special care in handling.Safeguard against sparks,fire or product <br /> —VIII=I —VIII spills.Failure to follow this warning could result in a fire or an <br /> VIII-VIII __ __ VIII-VIII explosion,and could result in death or serious injury. <br /> VIII-11 - __ II=VIII A WARNING <br /> VIII—VIII — IIII —VIII The tank must be adequately vented to prevent the development <br /> VIII-III — — _ III-VIII of vacuum or pressure when filling oremptying thetank.Failureto <br /> MITE III — — IIII = IIII properly vent the tank could cause tank failure,and could result <br /> °�����° 0 IIII—VIII in death or serious injury. <br /> =VIII-I I 00000 000a°a0000000a00000ao o° a — <br /> ° °0000°°°000°°°°°°°°°°°°°°°° — — 5.5.1.GENERAL <br /> 5.3.8.Proceed with points 5.2.13 through 5.2.23 of the dry-hole 5.5.1.1.Typically,tanks should be pressure tested before ballasting. <br /> installation instructions. • Do not use atmospheric air when testing pressure-testable tanks <br /> 5.3.9.Ballast the tank once the backfill is even with the top of the that have held flammable or combustible product. <br /> tank.See section 5.5. • Use nitrogen or other inert gas when testing these tanks. <br /> 5.3.10.Proceed with points 5.2.25 through 5.2.30 of the dry-hole 5.5.1.2.For most anchoring systems,a tank is not adequately protected <br /> installation instructions. against flotation until the tank is fully backfilled and the top slab is in place. <br /> Therefore,during the installation process,the tank should be ballasted <br /> 5.4.BOTTOM SUMPS AND FITTINGS completely after the backfill is at least 75 percent of the way up the tank <br /> 5.4.1.GENERAL and after postinstallation testing has been successfully completed. <br /> 5.4.1.1.When handling a tank with a bottom sump orfitting,always 5.5.1.3.Only underwet-hole conditions should ballast be added <br /> take extra care so that the bottom sump orfitting is not damaged before the backfill is 75 percent of the way up the tank.See section 5.3. <br /> by contact with any other object,such as the truck bed or the ground. 5.5.1.4.Care must be taken so that the use of ballast does not <br /> NOTE: During transportation and at the jobsite,tanks contaminate the product being stored.This is especially important <br /> with bottom sumps must be cradled to avoid damage for potable water,chemical and diesel exhaust fluid(DEF)tanks. <br /> caused by allowing the tank to rest on the sump. <br /> 22 <br />