My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082410
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13550
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0082410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:04 PM
Creation date
9/3/2020 2:37:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0082410
PE
4231
FACILITY_NAME
13550 HWY 12
STREET_NUMBER
13550
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05502002
ENTERED_DATE
7/31/2020 12:00:00 AM
SITE_LOCATION
13550 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.4.VENTING INTERSTITIAL SPACES NOTICE <br /> NOTICE Make sure that no heavy objects are allowed to distort the <br /> All wet monitoring systems must be vented for proper opera- containment sump top after final assembly.This includes <br /> tion.Failure to do this could result in damage to the tank and/or the street box and concrete pad.No weight should be <br /> surrounding property. transferred to the tank.Failure to follow this notice could <br /> result in property damage. <br /> 7.4.1.When the tank's interstitial space is filled with amonitoring 7,5.6.To complete the containment sump installation:' <br /> fluid,the space must be vented.It is sufficient to drill a /a-inch-diameter . Backfill to the top of the containment sump system. <br /> [6-mm-diameter]hole in the side or cap of the reservoir standpipe as <br /> supplied by the installer.If the groundwater level could be high enough • Backfill around the outside edge of the containment sump, <br /> to enter a drilled vent hole,install a vent line from the standpipe and making sure that no backfill is on top of the containment <br /> sump.See Figure 7.1,Backfill A. <br /> position it above the high-water level. <br /> • Isolate the containment sump from all traffic loads. <br /> 7.4.2.When the interstitial space is dry,it is not necessary to vent • Install a concrete form/barrier(for example,the concrete pad/street- <br /> the space to atmosphere. box frame)to allow a minimum 3-inch[7.5 cm] clearance between <br /> 7.5.INSTALLING CONTAINMENT SUMPS any load-bearing item and the containment sump top. <br /> • Typically,a sheet of plywood(or other material)is used as a barrier <br /> 7.5.1.Containment sumps come in a variety of models and sizes. and is set on the backfill to ensure that there is at least a 3-inch <br /> 7.5.2. Instructions for the different models are found in supplemental [7.5 cm]clearance above the containment sump top.See Figure 71, <br /> materials.See the Introduction for information on where to obtain Barrier B. <br /> supplemental instructions. • Choose a street-box size that allows enough clearance around <br /> the containment sump top opening for proper operation <br /> 7.5.3.The containment sump provides an enclosure for a submersible of the cover. <br /> pump and a termination point for secondary piping systems. • Set the street box,and check for clearance to allow access <br /> • It provides containment of product from the pump and/or piping and space to remove the watertight cover.See Figure 7.1, <br /> connections. Street Box C. <br /> • It is designed to be monitored continuously using electronic sensors. • Continue with backfill,as required,to subgrade.See Figure 71, <br /> 7.5.4. Before installing containment sumps: Backfill A. <br /> • consult all codes and regulations of appropriate governmental • Maintain good drainage of water away from the access opening <br /> agencies to ensure proper monitoring compliance of the containment sump top when installing the surface pad. <br /> • sssure that all containment sumps will be isolated from See Figure 7-1,Surface Pad D. <br /> traffic loads Figure 7-1 <br /> • perform a visual inspection of the sump for potential shipping <br /> damage No Backfill on the Barrier B <br /> • contact the manufacturing facility that shipped the tank if damage is Containment Sump <br /> detected <br /> • check to make sure the sump is the correct length for intended Surface <br /> burial depth. Pad D Street Box C Backfill A <br /> • obtain the specific containment sump supplement for the <br /> application installation.See Introduction for list of supplements. <br /> 7.5.5.Install the containment sump according to the supplemental <br /> instructions that apply.Go to zcl.com to find additional copies of the <br /> supplements. <br /> A CAUTION <br /> Always wear eye protection and gloves when handling,grinding, <br /> cutting and attaching the containment sump unit.Failure to do so TYPICAL <br /> could result in minor or moderate injury. INSTALLATION <br /> (Watertight Cover Shown) <br /> NOTICE <br /> Do not drop the containment sump assembly components or <br /> allow the sump body to roll.Since high winds could damage the <br /> sump components,protect and secure all pieces if windy condi- <br /> tions <br /> ondi tions arise.Failure to follow this notice could result in damage to <br /> surrounding property. <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.