Laserfiche WebLink
OPW Installation, Operation, and Maintenance Manual, Page 70 Executive Order vR-102-Q <br />Installationlnstructions: <br />1. Cut the tube to a length so that it is not more than <br />6" from the bottom of the tank. The tube can be <br />cut at a 45 -degree angle or per lo- cal codes or <br />requirements. File off any sharp burrs. <br />Operation and Maintenance. <br />Annually: Test the drop tube seal with CARE proce- <br />dure TP -201.1C or TP -201.1 D. If the drop tube seal <br />passes testing, no further maintenance is required. If <br />the drop tube seal fails testing, replace the drop tube <br />seal with OPW P/N' H11931M for 4" Tubes. Re -test <br />the drop tube seal with CARIB procedure TP -201.1 C or <br />TP -201.1. <br />FIIFI INC. CnNTA1"MFNT <Y(TFN< <br />3250 US 70 Business West <br />Smithfield, NC 27577 <br />Customer Service: 1 -(800) 422-2525 <br />Technical Service and Questions: <br />1-(877) OPW-TECH <br />www.opwglobal.com <br />