Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br />GPH =Gallons per hour, Y = Yes, N = No, NA Not <br />XVI. "LINE LEAK DETECTOR TESTING <br />r Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />This section must be completed if LLDs are installed. <br />Y <br />N <br />NA <br />Was a leak simulated to verify LLD performance? <br />Check all that apply.) Simulated leak rate verified: W 3 GPG r 1.1 GPG r 0.2 GPH <br />ry <br />r <br />r <br />Was the testing apparatus properly calibrated? <br />Is/ <br />r <br />r <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />r <br />r <br />I✓' <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />r <br />r <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />r <br />r <br />I o <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />r <br />r <br />Iv <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />r <br />r <br />I✓ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />r <br />r <br />W <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />FVO <br />r <br />r <br />Were all LLDs confirmed operational within regulatory requirements? <br />rVo <br />r <br />r <br />For any answer of 'W" above, describe in section X111 how and when these issues were or <br />will be corrected. <br />Xlll. COMMENTS <br />XIV, VACUUM / PRESSURE/ <br />HYDROSTATIC MONITORING <br />EQUIPMENT TESTING <br />r Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) P7 Vacuum r Pressure r H drostatic <br />Sensor lD <br />Component(s) Monitored by this Sensor' <br />Sensor Functionality <br />Test <br />interstitial <br />Communication <br />Test <br />S9 <br />87 PROD. LINE <br />rvo Pass r Fail <br />I*7 Pass <br />r <br />Fail <br />S10 <br />87 STP/ FILL LINE. <br />IvPass r Fail <br />I✓ Pass <br />r <br />Fail <br />S11 <br />87 VAPOR UDC'S LINE <br />P Pass r Fail <br />r7 Pass <br />r <br />Fail <br />S12 <br />91 PROD, LINE <br />IV' Pass rFail <br />1700 Pass <br />rFail <br />S13 <br />91 STP/FILL SUMPS <br />P Pass r Fail <br />(v' Pass <br />r <br />Fail <br />S14 <br />87/91 VENT LINE. <br />IV Pass rFail <br />IV Pass <br />rFail <br />S15 <br />DSL PROD, LINE <br />W Pass r Fail <br />h+ Pass <br />r <br />Fail <br />S16 <br />DSL STP/FILL SUMPS <br />�' Pass r Fail <br />I+' Pass <br />r <br />Fail <br />S17 <br />DSL VENT LINES <br />(✓ Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />r Pass r Fail <br />r Pass <br />r <br />Fail <br />How was interstitial communication verified? Simulated leak at far ends of the interstitial space. <br />r Other (Describe the method in section XV below.) <br />r <br />r7v <br />Visual Inspection <br />Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ty Yes r No (Describe the reason <br />in section <br />XV below.) <br />For any answer of 'W" above, describe in section X111 how and when these issues were or <br />will be corrected. <br />XV. COMMENTS <br />applicable, VPH =Vacuum/Pressure/Hydrostatic, ID =Identification <br />