Laserfiche WebLink
Step 2 ® DrV, Fit All Components <br /> A , Dry fit your tank riser to verify your measurements , After you have dry fitted all <br /> components and are satisfied with your measurements, apply an approved fuel resistant, non <br /> hardening thread sealant ( pipe dope ) to the NPT threads on both ends of the tank risers . <br /> Step 3 - Install Tank Risers <br /> A . Install and torque the tank risers into the tank bungs . <br /> For Replacing ExistingiloTite 85000 series Spill Containers with 85000= 1 series <br /> Spill Containers <br /> Step 1 Determining The Correct Tank Riser length for Spill Container Installation <br /> A . Existing tank risers with NO MIF 4X4 riser adaptor installed . — Using a tape measure , <br /> measure from the top of your riser to finish grade and/or top of the manway cover, Record <br /> this measurement. For Fill spill containers this measurement should be 18-118 " from the <br /> top of the riser to finish grade . For Vapor Spill Containers this measurement should be 18 " <br /> from top of riser to finish grade . If these measurements are less than the above <br /> measurements you must shorten your riser to meet these measurements . These <br /> measurements allow for an M/F 4X4 Riser Adaptor to be installed on top of the tank riser <br /> before the spill container is installed . If you are not installing an MIF 4X4 , add 1 -3/4" to <br /> your riser length . <br /> Remember, from finish grade to the top of the MIF 4X4 adaptor installed on the riser <br /> should be 16=318 " for Fill spill containers. See Figure 1 . <br /> B . Existing tank risers with MIF 4X4 riser. .adaptor installed — Using a tape measurer, measure <br /> from the top of the M/F 4X4 riser adaptor to finish grade and/or to the top of the stainless <br /> steel sleeve . Record this measurement. For Fill Spill Containers this measure must be <br /> greater than or equal to 18®318 " ( 16 318" — 20118" ) , and for Vapor Spill Containers this <br /> measurement must be greater than or equal to 16 114" (16114" — 20") v <br /> C . If your existing riser is to long , there are several possible ways you can shorten them . <br /> Some possible methods are : <br /> 1 ) Remove the nipple that would have been installed prior to 2001 under the pee-EVR <br /> Installation Instructions and Install a shorter nipple . Especially helpful for direct <br /> buried spill containers. <br /> 2) For multi-port systems , remove the existing rlser( s) and install the correct length <br /> nser(s), Use an MA 600 riser support bracket to maintain alignment 16" on center <br /> between the fill and vapor riser. <br /> 3) For direct buried risers with no nipple and coupler you maybe able to excavate down <br /> to tank top using a 10° to 11 OD PVC pipe placed over the 4" riser . Then remove <br /> the backfill material as you lower the pipe down over the riser. When you have <br /> reached tank top remove the 4" riser and install the correct length 4" riser per <br /> following Steps 2 & 3 . After you have installed the tank riser gradually remove the <br /> 10 — 11 " OD PVC pipe as you back fill the space between the 4 " riser and the 10 <br /> 11 OD PVC pipe . <br /> 2of8 <br /> I <br />