My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 5:31:32 PM
Creation date
9/8/2020 11:58:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 2 Instailinci the Black .Spill Cantainer onto the M/F 4X4 Riser Adaptor <br /> A. By hand , thread the black spill container onto the male threads of the M/F 4X4 riser adapter <br /> taking care not to cross thread the spill container riser. These threads are straight threads not <br /> NPT pipe threads . The spill container must screw down and seat on the top of the drop tube <br /> flare ( Fill ) or on the top of the M/F 4X4 riser adaptor sealing surface (Vapor) . <br /> Step 3 — Tiahteninq the Spill Container <br /> Using a 1/z" drive torque wrench and the Black tool adapter (T-7101 or T-7002 , Black) from <br /> PhII-rite T-7043 Tool Kit, tighten the Spill Container onto the M/F 4X4 Riser Adaptor threads to <br /> a torque value between 75 and 100 ft. Ibs . <br /> Step 4 — Final , Installation <br /> Check the measurement from the top of the black spill container to the top of the stainless <br /> steel sleeve at finish grade . Ensure there is at least 11 /4" inches of clearance (more is OK) <br /> from the top of the black spill container to the top of the stainless steel sleeve at finish grade . <br /> This will allow for the water tight cast Iron lid to fit properly and ensure that the spill container <br /> and tank riser are not in direct contact with the cast iron lid . This ensures the concrete with <br /> manway cover are not load bearing onto the tank fill and vapor risers . <br /> Step 5 — Drain Valve Testing <br /> Test the drain valve assembly as described in CARR procedure TP-201 . 1 D . <br /> Step 6 — After Spill. . Container . Installation <br /> The spill container is now ready for the installation of the rotatable (swivel ) adaptor and dust <br /> cap . Install the fill and/or vapor swivel adaptor using the SWF- 100B/SWV- 101 B Installation <br /> Instructions . <br /> 4of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.