Laserfiche WebLink
z <br /> u <br /> Mark and cut the drop tubes <br /> 1. Mark the upper drop tube with the length X. <br /> Upper Drop Tubes <br /> I <br /> Dual Point <br /> Measure from flange <br /> I X <br /> Poppeted Coaxial (EBW) <br /> Measure from retaining ring <br /> X <br /> LLoppeted Coaxial(EBW) <br /> re from bottom of lug <br /> I� X <br /> I <br /> OPW-Inlet Tube(for use with OPW®spill containers) <br /> Measure from end without flange,then remove flanged top <br /> X <br /> 2. Mark the lower tube with the length Y. <br /> Lower Drop Tube <br /> Cut straight <br /> j <br /> /Option: <br /> i cut approx.451 <br /> Y 11 1 <br /> NOTE: FFS recommends the FFS pipe cutter, but if you use a metal saw to cut the drop tube, <br /> make sure you cut it as squarely as possible. Use the band clamp included with the warning tag <br /> as a guide. <br /> 8 <br />