My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 5:31:32 PM
Creation date
9/8/2020 11:58:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PW <br /> 1. Check the float and flapper mechanism by rotating the outer coupler counter-clockwise. <br /> Make sure this activates the internal flapper and operates smoothly. <br /> ( 'yl <br /> O <br /> Outer coupler <br /> 2. Make sure the drop tube gasket is installed under the upper drop tube flange. (See step 3 of <br /> "Install the upper drop tube adapter.") <br /> 3. Thread the upper and lower drop tubes onto the OPV, and then use strap wrenches (not <br /> pipe wrenches) to tighten the drop tubes. Position one on the upper drop tube, and the <br /> other on the lower drop tube. Do not tighten the float shield or valve. <br /> 4 1 <br /> Use wrenches in this area. Use wrenches in this area. <br /> Do not use wrenches in this area. <br /> 4. Ground to earth to discharge any static electricity. <br /> 5. Carefully lower the completed OPV assembly into the riser pipe. <br /> Do not drop the assembly or force it down the riser pipe. If it does not fit, clean the riser <br /> pipe, and attempt to insert the OPV assembly again. If it still does not fit, the riser pipe may <br /> need to be replaced. <br /> 6. Reinstall the spill bucket components. <br /> 7. Use the stainless steel band clamp to install the warning plate around the 4" (102 mm) riser <br /> pipe below the threaded section. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.