Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Pape 4 of 61 <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? F1 I <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ® 1:1 ' El <br /> tested , and confirmed operational ? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with Q 1:1 EJ their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel' s backup battery visually inspected , functionally tested , and confirmed operational ? ® ❑ 0 <br /> boes the flow of fuel stop at the dispenser If a leak is detected in the under-dispenser containment? Q ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ® ❑ F]disconnected? _ _ <br /> Doessthe turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br /> Which sensors initiate positive shut down? (Check all that apply.) ® ❑ ❑ <br /> Q Sump ❑ Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e. g . , modem) operational? W1 1:1 El <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected, <br /> IX. COMMENTS <br /> Replaced TLS battery for PM Purpose , <br /> i <br /> r <br /> I <br /> i <br /> i <br /> I <br /> X. IN-TANK GAUGING TESTING <br /> Q Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> .This section must be completed if in-tank cVaugin0 is used to perform leak defection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ❑ ❑ ❑ <br /> ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally ❑ ❑ ❑ <br /> i I tested , and confirmed operational? <br /> -- - — - - — - <br />_ j Was accuracy of system's product level readings tested? j ❑ ❑ ❑ ` <br /> Was accuracy of system's water level readings tested ? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? ❑ Q ❑ <br /> For any answer of "N" above, describe in Section Xi how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> i <br /> i <br /> I} <br /> Y = Yes, N = No, NA = Not Applicable <br /> G <br /> i <br /> i <br />