Laserfiche WebLink
Comments: <br /> Liquid in the spill buckets . <br /> Alarms in the ast 30 d s . . . <br /> Tank 1 : high product 06/09 . <br /> Tank 3 : high product 06/09 , 06/ 145 07/03 . <br /> Items Requiring Follow"Up Actions: <br /> REMOVE LIQUID FROM SPILL BUCKETS . <br /> BE SURE THE DAILY CHECK SHEET IS COMPLETED DAILY! ! ! <br /> Instructions : <br />�!. Monthly visual 'inspection of the UST system must be conducted by a Designated UST Operator, who <br /> possesses a current "California UST System Operator" certification issued by the International Cade <br /> Council. <br /> A co o£ this monthly visual inspection checklist must be provided to the UST Owner or Operator, but <br /> pY <br /> not to the State Water Resources Control Board. <br /> The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during <br /> the monthly visual inspection that may require follow-up actions . <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection ite or, £ a checklist <br /> by the <br /> attachments for the previous 12 months. The records must be maintained on pP <br /> local agency, offsite at a readily available location. <br /> Page 2 of 2 November 2004 <br />