My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> C 0 U 4 'r <br /> Service Request Daily Time and Activity Summary from 3/24/2013 to <br /> 3/24/2050 for SR0079417 located at <br /> C-STORE W/76 FUEL ISLAND <br /> Activity Date Recorded by <br /> 02/12/2019 Received a response email from Mel Higginbotham PE 2303 MANZO <br /> 30 min <mhigginbotham@pmdginc.com>, "Can you please clarify; do you need the actual SC 031 <br /> listing document or would the listing number be sufficient without the full <br /> document? If the actual listing document is required, would the attached listing <br /> document for the Xerxes tank satisfy the requirement? I would like to know if this <br /> could be used as an example of what is required so that I can use it to illustrate <br /> the requirements to the manufacturers and their reps. Is this on the right track?" <br /> Emailed Mel back with a sample of a ul listing for OPW drop tube and <br /> compatibility information and the following information: "During our UST plans <br /> review we need to make sure that all proposed components that come in contact <br /> with fuel have a written approval from an independent testing organization, etc. (a <br /> print out of the first page showing part and listing will be sufficient as well as an <br /> indication that they are compatible with fuels like gasoline and diesel).As far as <br /> the document that you provided, I don't see anywhere inside that this listing is for <br /> Xerxes, so unfortunately this may not be sufficient. Please see attached sample <br /> OPW listing with includes the listing and its compatibility with flammable petroleum <br /> products. I hope that answers your question, please don't hesitate to call me if you <br /> have any questions." <br /> 02/19/2019 Reviewed an email received from Mel Higginbotham PE 2303 MANZO <br /> 12 min <mhigginbotham@pmdginc.com>with Xerxes UL listing asking if this is SC 031 <br /> acceptable, emailed him back indicating that it was acceptable. <br /> 04/02/2019 Received an email from Mel Higginbotham <mhigginbotham@pmdginc.com>with PE 2303 MANZO <br /> 18 min sample XERXES tank cut sheets asking if these will work, reviewed, replied to his SC 031 <br /> email indicating that they will be acceptable and to include them in his re submittal. <br /> 06/18/2019 Received an email from Chris Brown <cbrown@pmdginc.com> asking for the PE 2303 MANZO <br /> 24 min permit review approval status. Chris indicated that a submittal was made on SC 031 <br /> 5-24-2019, looked through all the emails couldn't find the submittal in question. <br /> Responded to Chriss, cc to Stacy Rivera: <br /> I apologize I do not see any emails that came from you on 5-24-2019. We <br /> received submittals on 5-20-2019 (from engel.molina@yahoo.com) and 5-28-2019 <br /> (from engel.molina@yahoo.com), however, I don't see anything from 5-24-219. <br /> Also, due to unusually large number of UST permit applications received by our <br /> office, I am not sure how soon we will be able to complete our review; all <br /> applications and their revision iterations are being reviewed in the order they were <br /> received and we have several applications which are in front of this one. Please <br /> forward me your email from 5-24-2019 with all the attachments and I will attach <br /> them to your permit application. I am including Stacy Rivera with our office on this <br /> email, going forward she will be overseeing this project's approval and <br /> implementation. <br /> 06/18/2019 Received an email from Chris Brown <cbrown@pmdginc.com> asking for the PE 2303 MANZO <br /> 12 min permit approval status indicating that a mailing was sent to our office on SC 031 <br /> 5-24-2019, looked for the sent package. <br /> Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.