My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> 1,12 :�; <br /> Materials j 10 Series Emergency <br /> Top:Cast iron Low Profile Patented Thermal Shut-Off Valves <br /> Relief valve OPW 10 Series Emergency Shut-off <br /> Body:Cast iron � 9 y <br /> Main Air Test Port <br /> Disc:M-19 Valves are installed on fuel supply <br /> , <br /> Poppet Secondary lines beneath dispensers at grade level <br /> Carrier:Zinc-plated steel Seat <br /> Poppet to minimize hazards associated with <br /> Stem:Copper-nickel-chrome-plated brass Fusible <br /> collision or fire at the dispenser. If the <br /> Poppet spring:stainless steel Link <br /> dispenser is pulled over or dislodged by <br /> Seal: M-19 0-Ring collision,the top of the valve breaks off <br /> Nickel-Plated, <br /> Packing nut:Brass,Teflon®-coated at the integral shear groove,activating <br /> Teflon-Coated 9 9 9 <br /> Inlet and outlet thread:1-1/2" (4 cm)NPT Main Stem poppets and shutting off the flow of fuel. <br /> (British threads available) Single-poppet models shut off supply <br /> "With black Duragard®E-Coating Combination Main Poppet <br /> Y flow,while double poppet models shut <br /> Features off supply as well as prevent release <br /> of fuel from the dispenser's internal <br /> 40- High Flow Capacity—the primary • Integral Test Port—a 3/8" (9.5 mm) j piping.The base of the emergency valve <br /> poppet is held out of the flow stream test port allows the piping system to be is securely anchored to the concrete <br /> while the secondary poppet is held air-tested without breaking any piping <br /> normally open to minimize head loss connections. dispenser island through a stabilizer bar <br /> across the valve and to protect the poppet .0, Patented Thermal Relief Valve— system within the dispenser sump or pan <br /> seals from damage and erosion.True relieves excessive pressure over 25 psi to ensure proper shearing action.The <br /> 1-1/2" (4 cm)and 2" (5 cm)body sizes caused by thermal expansion of fuel in the valve base is secured to the stabilizer <br /> ensure maximum flow. dispenser piping system in the event of bar using a three-point boss mount <br /> • Fire Protection—a fusible link trips fire(double-poppet models only). system or a U-Bolt Kit(not included) <br /> the valve closed at 165 F to shut off fuel ♦ Low-Profile Tops—female and union- 1 OUBK-015 (1-1/2")and 1 OURK- <br /> supply to the dispenser. top double-poppet valves have a low <br /> Main Poppet Seat Integral to the 0200(2 sold separately).Valve inlet <br /> pp g profile top to allow upgrading from OPW <br /> Top Assembly—having the main poppet single-poppet valves without changing (bottom)connections are female pipe <br /> seat as an integral part of the valve top existing piping. threads and outlet(top) connections <br /> ensures a new,clean seating surface is ♦ Multiple Mounting Options—valves are available with female threads,male <br /> installed each time the top is replaced. are boss-mounted to stabilizer bars in threads or a union fitting.Other options <br /> This design also ensures that the integrity sumps and pans or mounted to bars include suction system models with a <br /> of the seal between the valve top and embedded in the island with optional <br /> bottom is verified during line testing and U-Boltnormally closed secondary poppet which <br /> allows full inspection of the main poppet Versatile <br /> kits 1 Combination <br /> 15(not included). maintains prime,and models <br /> when the to is removed. Versatile Combination Body(boss mount/ <br /> p U-Bolt mount)models are available to with external threads on the inlet <br /> Duragard®-Coat Finish—provides accommodate most mounting applications body which connect to secondary <br /> superior corrosion resistance. with one valve style. containment systems. <br /> • Reliable Shut-off—a stainless steel • Underwriters Laboratories— 4l <br /> main spring,a teflon-coated brass packing listed for use with gasoline and 85%and <br /> nut and a copper/nickel/chrome-plated 100%methanol.All OPW 10 Emergency <br /> brass stem are designed to prevent tar Shut-Off Valves meet requirements of UL <br /> build-up and corrosion from interfering STANDARD 842. <br /> with poppet operation after long periods ♦ Compatible with 85%ethanol(E85) <br /> of normal service without activation. <br /> PA15 Offset Adaptor Ordering Specifications <br /> The OPW PA15 Offset AdaptorPart t1 Thread Size Offset Height Width <br /> is designed for adjusting in. mm in. mm in. mm in. mm <br /> misalignment of pipe in dispenser PA15-10 1V2 38.1 1 25 2v4 57.2 35/8 92.1 <br /> sumps and suction stubs. PA15-15 1'h 38.1 V12 38.1 2'A 57.2 4'/s 104.8 <br /> The PA15 has a low profile Materials <br /> feature,and is designed for PA15 20 1 /: 38.1 2 51 2/a 57.2 4' <br /> /s 117.5 <br /> maximum flow. Ductile Iron <br /> Zinc Chromate <br /> 9393 Princeton-066li Road Hamilton,Ohio 1 :1 :ra www.opwgiobal.com 119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.