My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wiring Instructions <br /> IMPORTANT! Wire used liar this installation must have a temperature rating of nt least 90°C.he either 14 or lE AWG, <br /> and be color coded. Splicing alarm power with TLS Console power Neill cause improper operation of the monitor. <br /> Wiring Overfill Alarm with Acknowledgement Switch <br /> ..................................................................................................._..................................---............................._..........................._................................._..................................... <br /> _ <br /> 1. Pull two wires from the switch to the Overfill Alarm. <br /> 2. Pull two wires for line and neutral from the switch to the power panel. <br /> 3. Pull one wire from the switch to the TLS Console for connection to the alarm rela.. <br /> 4. Pull one Swire for line fi•om the alarm relay in the TLS Console to the power panel. <br /> 5. Turn power Off and connect wiring according to the wiring diagram in Figure 3 and Table 1. <br /> O <br /> ® N <br /> Overfill Alarm <br /> (cover open) <br /> Horn Time <br /> Delay Relay <br /> ---- - Ack Switch <br /> (cover open) <br /> ® ®N <br /> To Console Relay- ® v <br /> See Console Connection ! ® M <br /> Table in this manual ® N <br /> Customer supplied <br /> junction box <br /> console\ovakwmeps N L <br /> _----------------_-------- <br /> To power panel <br /> Figure 3.Overfill Alarm/Acknowledgement Switch wiring connections <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.