Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces orvault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors, and 11) devices monitoring any other secondary containment areas. <br /> U ST Monitoring Site Plan <br /> - --'------q -- -- - - ---- - --- --- - -- -- --- - - -- -- - - - - - --- - -- -- - - --- - - - - 1 <br /> Site Address:_ I AG WANDS JET CENTER 4600 S. AIRPORT WAY STOCKTON CA 95206 <br /> 9CP.�ECOb7)3RF I I ALS7BS):1. - - _ _ <br /> CONTAMMNT <br /> TS-�TCRBLNXSUXEP <br /> G �4PILL BL C7iPT . . . . �5 gCp 5t9 <br /> sia>r <br /> 5[v <br /> "PIPLNG r . . . . . . _ _ . <br /> Dratvinz of piping <br /> exit of sump and <br /> UDC' :. No . . . <br /> underground r . . <br /> driumiaL . . . . . - MTM <br /> WZ&15" we <br /> cannot speculate <br /> Utue prints. <br /> ASG . . <br /> MTIII /�\\ <br /> KEY <br /> `Y F = FILLS TTs st rn <br /> T = TURBLNE �./ Ts <br /> P = PROBE <br /> V = VAPOR Tax. <br /> X = SUNT SENSOR MEP <br /> L = Leak Detector • <br /> 14I = 11faaTTss• - - _ Tank <br /> B = Brine Sensor TANK 1 . _ . . . . TANK 2 TANK 2. . TANK 3. _ <br /> I = Smart Sensor - <br /> S = STP <br /> C = Floats At Chains <br /> E = £ Stop <br /> _3rt• franc rrrt•I?rgruarrr)rea en-c rrcr tistSla to rlt ten{&rg rir'lmtetmr ra-e a <br /> . - pejessicraTloptracrror�t• arrloesde�:Ia ir�arnntmrrrlprn�xz�. Lh-mrirr; . <br /> tXlt t0 SCL�a f <br /> Date map was drawn: 2114ff 9 <br /> Instructions <br /> If you already have a diagram that shows all required Information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if Instatied monitor�ng system control panels; sensors monnormg tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other =secondary conlaLnment areas: mechanical or electronic line leak detectors: and inAank liquid level <br /> probes {if used for teak detection). In the space provided, nafe the date this Site Plan was prepared. <br /> LEGEND <br />