Laserfiche WebLink
UNDERGROUND STORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page s of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Site Address: ESTES EXPRESS 1634 SOUTH 7 ' STREET SAN JOSE CA 95112 <br /> KEY <br /> A = aV\'ULAR <br /> F = FILLS <br /> . T = TURBSNE <br /> . . . . . . . . . . . . . . . . <br /> P = PROBE <br /> V VAPOR <br /> X = SU]iP SENSOR <br /> 1 . L =Leak Detector <br /> a A V a I t F1 a I j A a I 1 9 x 9 a F A I = A Iffnilmy I <br /> . . . _ . . . . I I B =Brine Sensor <br /> I = Smart Sensor <br /> C =Floats & Chains <br /> BUILDING E- E = E Stop <br /> . . . . . . . . <br /> . - - - . <br /> DSL . . .NO LEAK DETECTORS OR - <br /> . . . . . . _ - TURSINSWATAUIU4 . . _ - <br /> . . . <br /> *PIPING } <br /> (ARROWS) <br /> . . - DratiyinE of piping <br /> . , . . . . . . . . . . . . . . . . . . . . . . . . . . d I exit of sump and <br /> UDC's. No <br /> • . - • 0 1 • . . • - • nndereround <br /> Any items imder ground that are not t-isible to the certi$•ing technician area drallw is <br /> ive <br /> profasaional opinion only and ars iolaly for informational purpoias. Dra�vmg canngCrjot <br /> speculate <br /> not to seal=_ cannot speculate <br /> blue prints. <br /> 7TH STREET <br /> Date map eras drawn: 57lilg <br /> Instructions <br /> Ifyou already have a diagram that shores all required information, you may include it rather than this pane, with your Monitoring System CerffoatiDn. On your site plan , <br /> sheer the general layout of tanks and piping. clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , di=_ penserpans, spill containers, or other secondary cantonment areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes ('d used for leak detection). In the space provided, note the date this Site Plan was preparad <br /> LEGEND <br />