My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
0
>
2900 - Site Mitigation Program
>
PR0529225
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 4:07:09 AM
Creation date
9/9/2020 4:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0529225
PE
2950
FACILITY_ID
FA0019479
FACILITY_NAME
PG & E LINE 108
STREET_NUMBER
0
STREET_NAME
UNION
STREET_TYPE
AVE
City
MANTECA
Zip
95230
APN
VARIOUS PARCELS
CURRENT_STATUS
01
SITE_LOCATION
UNION AVE
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do [RECENED <br /> ALISTO ENGINEERING GROUP utc 1 9 2008 <br /> ENVIRONMENT,HEALTH <br /> December 17,2008 PERMIT/SFRQES <br /> Ms. Margaret Lagorio <br /> San Joaquin County EHD <br /> 600 East Main St. <br /> Stockton,California 95202-3029 10-671-01 <br /> Subject: Permit Applications for Installation of Peizometers <br /> PG&E Line 108 Replacement Project <br /> Vicinity Of Manteca, California <br /> Dear Ms. Lagorio; <br /> Alisto Engineering Group (Alisto),is pleased to submit the enclosed permit applications an <br /> supporting information for the installation of 10 peizometers at the above-referenced location. <br /> The peizometers will be used to monitor shallow water levels prior to the replacement of a <br /> natural gas pipeline by PG&E forces;construction estimated to begin in September 2009. The <br /> peizometers will be properly removed after completion of the construction project(estimated <br /> January 2010). <br /> One of my staff,Mr.Scott Parker,spoke with you on the phone recently regarding the proposed <br /> installation,and as agreed,Alisto will provide to San Joaquin County surveyed locations of the <br /> peizometers within 30 days of completion or less. <br /> Please contact me if you need additional information. If you are in agreement with the bid <br /> proposal,please sign below and return a copy for our records. <br /> Sincerely, <br /> ALISTO ENGINEERING GROUP <br /> Chris Reinheimer <br /> Senior Project Manager <br /> Email creinheimer@alisto.com <br /> Attachments <br /> 2737 N. MAIN ST.,SUITE 100,WALNUT CREEK, CA 94597 •(925) 279-5000 •FAX (925) 279-5001 <br /> CALIFORNIA CONTRACTOR LICENSE NO.A-652544 <br />
The URL can be used to link to this page
Your browser does not support the video tag.