My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2900 - Site Mitigation Program
>
PR0545766
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:58:34 AM
Creation date
9/9/2020 4:53:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545766
PE
2965
FACILITY_ID
FA0015802
FACILITY_NAME
JESSIES GROVE WINERY
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
APN
01305017
CURRENT_STATUS
02
SITE_LOCATION
1973 W TURNER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL <br /> NEIL O. ANDERSON ENVIRONMENTAL <br /> A N D A S S O C I A T E S <br /> INSPECTIONS & TESTING <br /> LABORATORY SERVICES <br /> POOL ENGINEERING <br /> POST TENSION DESIGN <br /> February 4, 2005 <br /> Ms. Wendy Wyels, Supervisor <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive #200 ��� (��1 'D <br /> Rancho Cordova, California 95679-6114 �� <br /> FEB <br /> RE: Jessie's Grove Winery ENVIRONMENT H'U`�fIj <br /> WDR Order No. R5-2004-0079 PERMiTrERIJI�Es <br /> Dear Ms. Wyels, <br /> On behalf of Mr.Nick Sikeotis, Jessie's Grove Winery, we are please to submit the attached <br /> workplan detailing procedures and methods for installation and sampling of monitoring wells. <br /> The workplan includes a proposed schedule to bring the facility into compliance in the shortest <br /> possible time. As indicated in the proposed schedule, it may be possible to install monitoring wells <br /> and complete a report of installation prior to March 1,2005 provided we receive a prompt review of <br /> the workplan. Your prompt attention to this matter would be greatly appreciated. <br /> Should you have any questions regarding this letter or the accompanied workplan, please contact <br /> either Mr. Richard Ryan or myself at 209.3 67.3 70 1. <br /> Sincerely, <br /> Neil O. Anderson&Associates <br /> 0 <br /> o No. 2151 y <br /> CERTIFIED <br /> David J.Welch, M.Sc. ENGINEERING <br /> cP GEOLOGIST <br /> CEG-2151, CHG-653, GP-1049 �Q <br /> Environmental Department Manager <br /> CC: Mr. Mike Huggins, San Joaquin County Environmental Health Dept. <br /> Mr. Nick Sikeotis, Jessie's Grove Winery <br /> Mr. Tim O'Brien, California Regional Water Quality Control Board <br /> LODI - SACRAMENTO • MODESTO <br /> ENVIRONMENTAL DIVISION 902 Industrial Way•Lodi,California 95240.209.367.3701 •FAX 209.369.4228•www.noanderson.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.