Laserfiche WebLink
� i <br /> a'aaaaaaaa ONE <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL, PREVENTION EQUIPMENT INSPECTION REPO , ORM (Page 1 of 1 ) <br /> Type of Action ElInstallation Inspection ElRepair Inspection El 36 Month Inspection <br /> 1. FACILITY INFORMATION Ll . <br /> CERS ID Date Overfill Pre ment Inspection <br /> 10456027 /30/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> TRACY 76 <br /> Cit I T953;76 <br /> de <br /> Business Site Address City <br /> 2420 W GRANT LINE ! <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNI , i <br /> At I INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Cedfflcahon ) I Phone # <br /> David Winkler (209) 744-0112 <br /> Contractor I Tank Tester License # ICC Certification # ICC jertification Expiration Date <br /> 08-1739 Ex. 3/31 /2020 8883059-UT 1 /29/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> FF- EBW , PhilJite & EVR Phase 1 1009853708 Ex 11 /29/20 OPW 104-633 E 3A 2020 <br /> Emco #3207 Ex. 11 /16/20 ATG: VR: B34975 ATG : 2/8/20 INC 11 9853708 Ex. 11 /30/2020 <br /> Ilia OVERFILL PREVENTION .EQUIPMENT INSPECTIC MATION <br /> inspection Method I] Manufacturer Guidelines (Specify): <br /> Used: <br /> REMOVED DROP TUBES <br /> ❑ Industry Code or Engineering Standard (Specify): <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the inspection procedures and all documentation required to determine the r 'ult ,! 4 <br /> TANK ID: (By tank number, stored product etc.) 87 91 ( dSi <br /> What is the tank inside diameter? (Inches) 95 . 50 95 50 95 . 50 <br /> Is the fill piping secondarily contained? ❑ Yes © No ❑ Yes No ❑ Ybs ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained? ❑ Yes EjNo ❑ Yes n No [] ' s O No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) OPw OPw oPw <br /> 61 SO 61 SO 61 S0 <br /> What is the overfill prevention equipment response ❑x Shuts Off Flow [] Shuts Off Flow (] 6 uts Off Flow ❑ Shuts Off Flow <br /> when activated? l <br /> (Check a!1 that apply.) ❑ Restricts Flow El Restricts Flow ❑ � strias Flow El Restricts Flow <br /> ❑ AAlarm ❑ AN Alarm ❑ Alarm ❑ AIV Alarm <br /> N <br /> Are flow restrictors installed on vent piping? ❑ Yes 0 No ❑ Yes I] No ❑ Yps ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> to activate? (Inches from bottom of tank) 851 /2 861 /2 951 /2 <br /> What is the percent capacity of the tank at which the g3 95 94 <br /> overfill prevention equipment activates? <br /> Is the overfill prevention in proper operating condition Yes EI Yes x s ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑ No (Specify in V.) ❑ No (Specify in V.) ❑ o (Specify in V.) ❑ No (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESU 4 S <br /> Overfill Prevention Inspection Results Q Pass ❑ Fail 0 Pass ❑ Fail Q ass ❑ Fail El Pa ❑ Fail <br /> V. COMMENTS ' I j <br /> Any items marked "Fail' must be explained in this section. Any additional comments may !so be provided here. <br /> ! i <br /> i � <br /> Vi. CERTIFICATION BY UST SERVICE TECHNICIAN CONDLJCTINO THIS INSPECTION <br /> 1 hereby certify that the overfill prevention equipment was inspected In accordance w h Coo lifornia Code of Regulations, Title 23, <br /> Division 3, Chapter 16, Section 2637.2 and all the information contained herein is aci urat <br /> UST Service Technician Signature �d <br /> ij <br /> If the facility has more components than this form accommodates, additional copies of this pag M" a D attached. <br /> 11 <br /> CERS = Caf nia Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = I Council, AN = Audible and Visual <br /> I <br />