Laserfiche WebLink
ARCADIS <br /> modifications. Modifications to the approved Work Plan will be documented in the field <br /> logbook and in the PEA report. <br /> If additional characterization of the Site, beyond that set forth in this Work Plan, <br /> becomes necessary due to encountered conditions, an addendum to this Work Plan will <br /> be prepared to document the encountered conditions and to provide the procedures and <br /> rationale for the planned additional characterization. <br /> 5.0 HEALTH AND SAFETY PROCEDURES <br /> A site-specific HASP has been prepared for the fieldwork portion of this PEA. This <br /> HASP is presented in Appendix B. ARCADIS personnel and subcontractors supervised <br /> by ARCADIS staff will be required to follow the procedures set forth in the HASP. <br /> Independent subcontractors will be responsible for providing proper safety procedures <br /> and monitoring for their own personnel. <br /> 6.0 PEA REPORT PREPARATION <br /> A PEA report presenting the results of the overall investigation will be prepared. The <br /> report will include site background and environmental setting information, field <br /> procedures, presentation of field observations, and analytical results including <br /> laboratory report sheets, data review results, a tabular summary of the analytical <br /> results, screening evaluations for the analytes (reporting limits, CHHSLs, and ESLs for <br /> COCs are provided in Attachments 1, 2, and 3 of the QAPP), and recommendations (as <br /> appropriate). <br /> 7.0 PROPOSED WORK SCHEDULE <br /> The proposed tentative major milestone dates for the completion of the tasks associated <br /> with the PEA are as follows: <br /> wp-PEA-Gordon-Jul10-RV009808.doc: Page 27 <br />