My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:15 PM
Creation date
9/10/2020 11:05:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231628
PE
2361 - UST FACILITY
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
25651 N HWY 99 ACAMPO 95220
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 5/29/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces orvault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> .. .. . ...... ...... . .y ... , ..., . <br /> Site Address: COLLIER RD CHEVRON 25651 H HWY 99 ACAMPO CA 95220 <br /> *PIPL1 G } <br /> (ARROWS) <br /> DratrinE of . . . _ <br /> P41131=0 eat of <br /> aunip and UDC's. _ _ _ _ - _ _ . _E . ..Q� . . <br /> 1Vro lmdererolmd . . . . . _ _ _ C STD1Zt. . _ <br /> &al%rrug is <br /> cannot speculate . _ . . . . . . • <br /> blue prints. <br /> S <br /> . . . A = AN-I-ULAR <br /> F = FILLS <br /> T = TL'RBLNY <br /> P = PROBE <br /> . . . . V= VAPOR <br /> X= SiniP SENSOR <br /> X L = Leak Detector <br /> Al = Afanwa <br /> B = Brine Sensor <br /> I = Smart Sensor <br /> Y L S = STP <br /> 1 X C = Floats R Claim <br /> L E = E Stop <br /> 87 91 DIE <br /> VENTS . . <br /> A OA OA O O <br /> AP Renu rordargronmd char ars not vcfbte ro the rertj6-ing reeloricimi ars a <br /> profssionalopinion ortivmid are solehfor- iiZ/ornraffatalptoposa:. Drmtuto <br /> nor ro :rale <br /> Date map was drawn: 5!29!19 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may Include it, rather than this page, with your Monitoring System Certification. On your site plarr, <br /> show the general layout of tanks. and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas; mechanical or erectronfe line leak detectors; and in-tank liquid level <br /> probes (if used for leak detecbon). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.