My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN ALLEN
>
17327
>
2900 - Site Mitigation Program
>
PR0523609
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 11:49:19 AM
Creation date
9/10/2020 11:42:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523609
PE
2950
FACILITY_ID
FA0015938
FACILITY_NAME
MATHIAS PROPERTY
STREET_NUMBER
17327
Direction
S
STREET_NAME
VAN ALLEN
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
20508025
CURRENT_STATUS
01
SITE_LOCATION
17327 S VAN ALLEN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> M 1117 Lone Palm Avenue, Suite B <br /> Modesto,California 95351 <br /> 209-579-2221%YC <br /> A S S O C I A T E S I N C . <br /> fax:209-579-2225 <br /> Report Preparation <br /> Upon completion of site activities, a summary report will be prepared for submittal to San <br /> Joaquin County Environmental Health Department (SJEHD). The report will include a <br /> description of all field activities, laboratory analytical results, boring logs, and recommendations. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with ATC's site <br /> specific Health and Safety Plan (HASP) and Quality Control/Quality Assurance Plan included as <br /> Attachments 1 and 2. <br /> Projected Schedule <br /> Once approval of this workplan has been received, ATC will confirm a schedule for drilling <br /> activities. ATC will notify SJEHD at least 48 hours prior to beginning any field activities. The <br /> summary report will be submitted to SJEHD approximately three to four weeks after the <br /> completion of field activities. <br /> If you have any questions or require additional information regarding this workplan, please <br /> contact us at (209) 579-2221. <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> Jim Kundert <br /> Staff Geologist <br /> Jeanne Homsey, P.E. <br /> Registered Engineer No. C47410 <br /> Attachments <br /> i 8 �?O <br /> cc: Mr. Fritz Chang, The Lyle Company `"'S' ,'-" <br /> 4•t <br /> wAwordprog 3 7 7 8\0004\wkp.doc 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.