My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 2:25:58 PM
Creation date
9/10/2020 2:06:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POMECO Multi -Port Spill Container Manhole <br /> Installation Instructions 3 . Remove the cover and measure the distance <br /> from the top of the tanks to the final grade . <br /> 1 . Mark off finish grade . (See Figure 1 . ) <br /> 4 . Cut the riser(s) from the underground tank so <br /> Finish Grade that both the fill and vapor risers are set below <br /> the final grade . Use the dimensions below: <br /> Spill Container Inches below grade ( L) <br /> 5 Gal . Cast Iron Base 15 '/" <br /> Figure 1 5 Gal , Composite Base 171/2 <br /> 7 . 5 Gal , Cast Iron Base 19 / <br /> 7 . 5 Gal . Composite Base 21 1/2" <br /> 2 . Set multi-port manhole assembly (skirt , ring , and Note: Add an extra 34/4 " when using an OPW <br /> cover) to the final grade position . (See Figure FSA400 Face Seal Adaptor. (See Figure 2.) <br /> 2 . ) <br /> 5 . Deburr and thoroughly clean riser pipe (s ) . <br /> Finish Grade 6 . Apply pipe dope to riser( s) . The pipe dope is to <br /> be a non -hardening , gasoline resistant , pipe <br /> thread seal compound . <br /> 7 . Install OPW FSA-400 Face Seal Adapter onto <br /> riser. ( Recommend Torque , 4" NPT , 125 ft-lbs <br /> min . to 250 ft-lbs max . ) . Apply pipe dope to <br /> FSA-400 . The pipe dope is to be a non- <br /> hardening , gasoline resistant, pipe thread seal <br /> compound . This is optional for spill containers <br /> that are on the vapor lines . <br /> 8 . Thread the spill containers on hand tight . <br /> Note : Do NOT attempt to completely tighten the <br /> Figure 2 containment bucket by using the containment <br /> bucket mounting ring at the top of the bucket . <br /> Note : It is strongly recommended that POMECO 9 . Inspect the containment bucket gasket(s) and <br /> covers be installed with the following minimum the ring gasket for damage . Replace the <br /> clearances . Sheet metal skirts should have gasket(s) if they are damaged . <br /> adequate clearance between the tank sump riser 10 . Apply an even bead of PISCES SL- 1100 to the <br /> sidewall and or the sump top hat. A minimum of topside of the containment bucket gasket(s) , <br /> one and a half inches clearance on all sides is ( See Figure 4 . ) <br /> recommended between the POMECO skirt and <br /> the tank sump wall or the sump top hat wall . A ; 4ont\ainSmLent <br /> L- 1100 <br /> minimum of two inches clearance is <br /> recommended between the bottom of the �\ ing <br /> POMECO skirt and the horizontal surface of the � asket <br /> tank sump or sump top hat. These clearances <br /> are recommended to allow adequate water <br /> migration away from the sumps . Great careshould be used to maintain the recommended <br /> clearances when setting the rings and pouring Bucket <br /> the concrete . ( See Figure 3 . ) Gasket <br /> Figure 4 <br /> F <br /> 1 '/Z Min 11 . Apply an even bead of PISCES SL- 1100 to the <br /> J topside of the ring gasket . ( See Figure 4 . ) <br /> 12 . Replace the multi -port cover, centering the <br /> riser(s) as close as possible in the containment <br /> openings . Be very careful not to move or <br /> damage the gaskets . <br /> Figure 3 <br /> POMECO Multi port Spill Container Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.