Laserfiche WebLink
3 . SECONDARY VENT PIPE TESTING <br /> Company Name : B .Z. Service Station Maintenance <br /> Company Address : 1041 Triangle Ct. , West Sacramento, CA 95605 <br /> Credentials : ® CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester <br /> License Type : ICC License Number, 433159 <br /> Test Equipment Used : PRESSURE GAUGE Equipment Resolution : 0. 5 PSI <br /> MEMO= Piping Run # 87 Piping Run # 91 Piping Run # DSL Piping Run # <br /> Piping Material : FBG FBG FBG <br /> Piping Manufacturer: UNK UNK UNK <br /> Piping Diameter: 3 " 3 " 3 " <br /> Length of Piping Run : 150 ' 150 ' 150' <br /> Product Stored : UNL UNL DSL <br /> Method and location of BOOT BOOT BOOT <br /> i in -run isolation : <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time : 10 : 28 11 : 57 1 : 30 <br /> Initial Reading (Ri) : 5 PSI 5 PSI 5 PSI PSI <br /> Test End Time : 11 : 28 12 : 57 2 : 30 <br /> Final Reading (RF) : 5 PSI 5 PSI 5 PSI PSI <br /> Test Duration : 1 HR i HR 1 HR 1 HR <br /> Change in Reading (RF-R,) : 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result; !® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fair ❑ Pass ❑ Fal <br /> Comments — (include information on repairs made prior to testing, and recormnended•follow- up •forfailed tests) <br /> Secondary Containment Test Results 3 of 6 <br />