Laserfiche WebLink
2. SECONDARY PRODUCT PIPE TESTING <br /> Company Name: B.Z. Service Station Maintenance <br /> Company Address: 1041 Triangle Ct.,West Sacramento,CA 95605 <br /> Credentials: ®CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester <br /> License Type: ICC License Number:433159 <br /> "fest Equipment Used: PRESSURE GAUGE Equipment Resolution:0.5 PSI <br /> Piping Run#87 Piping Run#91 Piping Run#DSL Piping Run# <br /> Piping Material: FBG FBG FBG <br /> Piping Manufacturer: UNK UNK U N K <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 150' 150' 150' <br /> Product Stored: UNL UNL DSL <br /> Method and location of BOOT BOOT BOOT <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time: 10:28 11:57 1:30 <br /> Initial Reading(Rt): 5 PSI 5 PSI 5 PSI PSI <br /> Test End Time: 11:28 12:57 2:30 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI PSI <br /> Test Duration: I HR 1 HR 1 HR 1 HR <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br /> Secondary Containment Test Results 2 ol'6 <br />