My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 4:09:03 PM
Creation date
9/10/2020 3:54:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231704
PE
2361
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
01
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> ing requirements stated in this recommended practice are <br /> general statements and may vary. Recommended prc, 6. SPILL BUCKET A N D <br /> sure levels and test durations are addressed in Section 5.7. CONTAINMENT SUMP <br /> `. Piping manufacturers'test procedures may differ. TESTING <br /> This test can be conducted in sections or as one con- <br /> tinuous <br /> on tinuous pipe depending on the installation.Care should he 6.1 General. Spill buckets and containment sumps for <br /> taken to ensure that the entire secondary containment of tank systems are neither intended nor designed for the <br /> the piping system is tested. storage of petroleum products,but rather to contain small <br /> 5.6 Test Equipment. Test equipment shall include: leaks and spills for short periods of time. This section <br /> describes the procedures used to test the integrity of spill <br /> • inert gas source(nitrogen,helium,etc.); buckets and containment sumps to ensure that they do not <br /> • stopwatch or other time-measurement device capable leak, <br /> of measuring a I-second increment; 6.2 Spill Bucket Integrity Testing — Hydrostatic <br /> • test tubing assemblies (Tubing assemblies provide Test Method. <br /> access to the beginning and end of the interstitial <br /> space')' WARNING: Do not use fuels such as Baso- <br /> • pressure gauge with a 15 psig maximum pressure read- line, E85 or diesel as a test fluid because <br /> ing with 0.5 increments. they present a serious fire and safety <br /> hazard. Gasoline vapors are flammable <br /> 5.7 Test Procedure. and can explode if exposed to an ignition <br /> 1.If necessary, re-install termination (test) boots at pip- source such as a spark or open flame. If <br /> ing terminations. a tank or containment area is not tight, <br /> using fuel as the test fluid will cause a <br /> 2.If necessary,connect the tubing assemblies to the sec- release into the soil or groundwater. <br /> ondary containment termination fitting on each end of <br /> �✓ the section of piping to be tested. <br /> 3.Connect the inert gas source and pressure gauge. <br /> 4.Gradually pressurize the interstitial space to 5 psig. <br /> Close the valve and allow the pressure to stabilize. <br /> Re-pressurize to the specified test pressure if necessary. water Level <br /> 5.Observe the pressure for a period of 1 hour. <br /> 6. If the piping pressure after I hour is less than the test <br /> pressure,check termination Cuttings and test assemblies <br /> for leaks. - <br /> 7.Release the pressure on the system slowly. <br /> S. Remove the test equipment. <br /> 9. Restore the piping to its normal operating condition. <br /> 5.8 Pass/Fail Criteria. U no pressure change cx-curs – < <br /> during the test period. the piping system passes the sec- <br /> ondary containment integrity test. FlGURE 6-1. The hydrostatic method of determining <br /> spill bucket integrity uses water to detect leaks. The <br /> If there is any drop in pressure over the test period, the measuring stick must be placed In the same location <br /> piping fails the secondary containment integrity test. at the beginning and end of the test period to ensure <br /> If there is any increase in pressure over the test period. accurate water level readings. <br /> repeat the test. <br /> pei.org_.4D <br />
The URL can be used to link to this page
Your browser does not support the video tag.