My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 4:09:03 PM
Creation date
9/10/2020 3:54:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231704
PE
2361
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
01
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,leak Detection and Secondary Containment Equipment at UST Facilities <br /> • inspect and reinstall all containment sump If the water level changes 1/8(0.125)inch or great- <br /> lids, gaskets and covers. er. the containment sump fails the integrity test. <br /> 6.5.7 Pass/Fail Criteria. If the water level 6.6 Accelerated Precision Hydrostatic Test for Spill <br /> changes less than 1/8(0.125)inch,the containment Buckets and Containment Sumps, Electronic preci- <br /> sump passes the integrity test. sion test equipment can be utilized to test spill buckets <br /> and containment sumps. It incorporates more sensitive <br /> equipment that permits a test to be conducted in a shorter <br /> period of time.The procedures use the same test fluid and <br /> tests the same volume as other methods outlined in this <br /> chapter.The manufacturer of the measurement equipment <br /> should specify the precision and duration of the test and <br /> the pass/fail criteria. However, pass/fail criteria should <br /> not be less stringent than those prescribed for the 1-hour <br /> test in Section 6.5.7. <br /> The data sheet for Sections 6.2 or 6.5 may he used for this <br /> test.Refer to Appendix D. <br /> A <br /> 6.7 Proper Disposal of Test liquids. Test liquids <br /> must be disposed of properly. Check with the AHI <br /> regarding requirements for proper disposal. <br /> FIGURE 6-7. The test fluid level in the tank sump must <br /> be at least 4 inches above the highest sump penetra- <br /> tion or sidewall seam. <br /> 7. UST OVERFILL EQUIPMENT <br /> `"' VERIFICATION, INSPECTION <br /> AND TESTING <br /> Although the effectiveness of uverf"W prevention devices <br /> can be tested by attempting to overfill a UST with <br /> product and determining how well the device functions, <br /> this approach is not recommended. Any malfunction in <br /> the overfill prevention device could result in a product <br /> release that could result in a threat to public health and <br /> safety and environmental damage. <br /> Federal UST rules require that overfill prevention equip- <br /> ment automatically restrict flow or alert the transfer <br /> operator when the tank is no more than 90 percent full <br /> r _ or shut off flow into a tank when it is no more than 95 <br /> percent full.Other alternatives to prevent overfills are the <br /> restriction of flow during a delivery 30 minutes prior to <br /> overfilling.alerting the operator 1 minute before overfill- <br /> ing may occur-, or automatically shutting off flow into a <br /> tank so that none of the fittings located on top of the tank <br /> are exposed to product due to overfilling. <br /> The committee has written the recommended practices <br /> FIGURE B-B. Measuring sticks used to measure the for automatic shutoff devices to reflect that the devices <br /> water level should be securely mounted to ensure that must be set to shut off flow when the tank is no more <br /> they do not move during the test. than 95 percent fuU, and flow restriction and overfill <br /> ei-orcl 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.