Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Page 6 of a) <br /> XII. LINE LEAK DETECTOR TESTING <br /> Fsecdon <br /> k this box if line leak detectors (LLD) are NOT Installed. (Do not complete this section.) Y N NA <br /> ust be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ® ❑ ❑ <br /> Check all that app&j Simulated leak rate verified: 10 3 GPH ❑ 0. 1 GPH 0.2 GPH <br /> Was the testing apparatus properly calibrated? ® ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak Is detected? ❑ ❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? ® ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? ® ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ® ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ® ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ® ❑ ❑ <br /> Were all items on the equipment manufacturers maintenance checklist completed? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ® ❑ ❑ <br /> For any answer of "N" above describe in section X11 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ® Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s) Monitored by this Sensor Test Test <br /> ❑ Pass ❑ Fail ❑ Pass Cl Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑ Simulated leak at far ends of the interstitial space. ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels In all interstitial spaces? ® Yes ❑ No (Describe the reason in section XV below.) <br /> Foran answer of "FAIL" above describe in section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> i <br /> i <br /> nPN a ralkum nPr hN it Y a Voa N o Nn Ne = Nnt anrs1kW4o VPH a Van n m ProaaumMvdwvo r in a kw tmralinn <br /> i <br />