Laserfiche WebLink
SWRCB , January 2006 <br /> Spill Bucket Testing Report <br /> 1 . FACILITY INFORMATION <br /> Facility Name : ARP Mini Mart Mobil Date of Testing : 2/21 /2019 <br /> Facility Address : 25775 S . Patterson Rd , Tracy, CA 95376 <br /> Facility Contact : Neil Patel Phone : (510) 299- 1219 <br /> 2 . TESTING CONTRACTOR INFORMATION <br /> Company Name : Diamond Petroleum Services , Inc . <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor License # 1005444 ICC Certification 9 5250451 <br /> 3 . SPILL BUCKET TESTING INFORMATION <br /> Test Method Used : Hydrostatic <br /> Test Equipment Used : Standard Tape Measure Equipment Resolution : 1 / 16" <br /> Identify Spill Bucket (Bjy Tank Tl : 87 Slave Fill T2@ 87 Master Fill T3 : Diesel Fill T4 : 91 Fill <br /> Number, Stored Product, etc.) <br /> Bucket Installation Type : Direct Bury Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump x Contained in Sum x Contained in Sum x Contained in Sum <br /> Bucket Inside Diameter: 11 " 11 " 11 " 1 1 " <br /> Bucket Depth : 17" 12 1/.1" 16 1 /8 13 ''/a" <br /> Wait time between applying S minutes S minutes 5 minutes S minutes <br /> vacuum/water and start of test : <br /> Test Start Time (Ti) : 2 : 00 p.m . 2 : 05 p . m . 2 : 10 p. m . 2 : 15 p.m . <br /> Initial Reading ( Rr) : 16 '/2" 12 ''/1" 15 11 13 1/.111 <br /> Test End Time jr) : 3 :00 p . m . 3 : 05 p . m , 3 : 10 p. m , 3 : 15 p . m . <br /> Final Reading ( Rr) : 16 ''/2" 121/4 15 " 131A <br /> Test Duration (Tr — Ti) : 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading ( RF - R►) : 0 0 0 0 <br /> Pass/Fail Threshold or 1 /8" 1 /8" 1 /8" 1 /8" <br /> Criteria : <br /> Test Result: x 'Pass Fail Pass x Fail x Pass Fail Pass x Fail <br /> Comments : The spill buckets passed the hydrostatic test for 1 hour but , the spill buckets on T2 : <br /> 87 Master and T4 : 91 do not hold the 5 gallons capacity. The spill buckets need to be <br /> replaced and the 4 " riser needs to be cut/threaded or replaced in order obtain the 5 gallons <br /> capacity . <br /> Technician ' s Signature :, ,,.. ` �� Date : 2/21 /2019 <br /> i <br /> i <br />