My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 2:29:11 PM
Creation date
9/11/2020 2:54:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 25: INSTALL WARNING PLATE <br /> Bend the three warning plate ears down then slide <br /> the tie wrap over the warning plate ears and position <br /> warning plate against riser pipe approximately 1" <br /> below the adaptor. Tighten the tie wrap securely. <br /> The valve is now fully installed and in operating <br /> position. <br /> OPW <br /> o. Sit <br /> ® �1 <br /> Manufacturer: "OPW" <br /> Model: 71 SO-4" <br /> (4" represents size) <br /> Manufacture Date: <br /> "MFG MMYT <br /> MM=Month YY=Year <br /> Warning <br /> Plate <br /> Figure 26—Product Identification <br /> Figure 25 <br /> STEP 26: VALVE REMOVAL <br /> The valve can be removed for tank leak testing, <br /> inspection, etc., by removing the Rotatable Product <br /> Adaptor, the 4" nipple, and the Jack Screw Kit. <br /> Reinstall per the above instructions. <br /> STEP 27: ELECTRONIC LIQUID LEVEL <br /> MONITORING <br /> If an electronic level monitor is installed, it must be <br /> calibrated to match the top of the 71 SO valve body, <br /> which must correlate with 95% of the actual tank <br /> capacity. <br /> 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.