My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 2:29:11 PM
Creation date
9/11/2020 2:54:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSEMBLY INSTRUCTIONS Measuring Stick <br /> IMPORTANT : Each of the numbered steps in the <br /> installation instructions are designed as a CHECK <br /> LIST to ensure proper installation and trouble free <br /> operation of the OPW 71 SO Overfill Prevention <br /> Valve . <br /> Riser Pipe <br /> Read and follow these steps carefully , checking with Face (A) <br /> them off as you proceed . Seal Adaptor To Tank <br /> Top ( I . D ) To (Tank <br /> Figure numbers correspond to step numbers for Bottom <br /> easy reference . — <br /> STEP 1 : MEASURE 6- 1 /2" <br /> Install the OPW Face Seal Adaptor and the OPW LJ <br /> Thread -on Spill Container on the Fill Riser ( Refer to <br /> the Installation Instructions Supplied with the Spill Figure 1 <br /> Container) . Insert the 71 SO measuring stick <br /> through the riser pipe and hook it under the inside of --- <br /> the tank in the lengthwise direction . Mark the <br /> measuring stick at the top of the Face Seal Adaptor <br /> threads inside the base of the spill container bucket _ <br /> 4" NPT <br /> just below the drain valve outlet window ( See Figure <br /> 1 & 1A) . The top flange on the 71 SO will rest on the Nipple <br /> Face Seal Adaptor just below the drain valve outlet , <br /> and be locked in place between the Face Seal <br /> Adaptor and the 4 " nipple that is installed in the spill -� <br /> container with the Jack Screw Kit ( See Figure 1A) . o <br /> ( For riser pipe configurations other than that shown , OPW Spill <br /> consult installation drawings or use other necessary Container <br /> means to measure Dimension "A" ) . Jack Screw <br /> Mark measuring Kit <br /> Using a tape measure , measure the distance from stick here for <br /> the top of the Face Seal Adaptor in the spill Jack Screw I O - Ring Seal <br /> container to the bottom of the tank ( Dim . " B " ) . installation <br /> (Top of Face Face Seal <br /> IMPORTANT : Inspect the riser pipe for any foreign Seal Adaptor) j 71SO Adaptor <br /> material . Over spray from tank relining or any <br /> internal burrs inside of pipe must be removed prior Figure 1A <br /> to installation . Failure to have an unobstructed riser <br /> pipe may prevent proper installation and operation of <br /> the valve . The 71 SO is designed for installation into <br /> schedule 40 riser pipes . The 71SO cannot be Measuring Stick / <br /> installed into schedule 80 riser pipes . <br /> STEP 2 : MARK THE TUBE <br /> Use the result from STEP 1 and HOW TO LOCATE <br /> THE POSITION OF THE 71 SO AT 95 % TANK Transfer Mark <br /> CAPACITY to mark the upper tube . Measure the From Stick to <br /> distance from the seam where the upper tube and Upper Tube <br /> valve body meet . For " C " measurements less than ( Cut Line) <br /> or equal to 6 - 1 /2" see Figure 2 . For ' Seam <br /> measurements greater than 6 - 1 /2 " use a tape - - <br /> measure to mark the calculated upper tube length Figure 2 ( Fore`£ ' ' lest than' ttrq � oi - 1 /2 " <br /> onto the upper tube . only ) <br /> 65 <br /> F I iVlRn ailit= tt Ii`, l_ <br /> Jt <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.