My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 2:29:11 PM
Creation date
9/11/2020 2:54:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
标签
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin a l l HEALTHY AIR LIVING- <br /> www,heaIthyairfiving.cam <br /> AIR POLLUTION CONTROL DISTRICT Make one change for clean air! <br /> TP 201.3 <br /> UST Static Pressure Performance Test Report Form <br /> Permit Number:N-747-1-6 Test Company:Tanknology Inc. <br /> Site Name: 7-ELEVEN#17334 MKT 2368(N-747) Technician: Darren Sciume <br /> Site Address:4501 N.PERSHING AVE.@ ROSEMARIE LN. Certification Number Expiration Date <br /> City:STOCKTON Zip: 95207 District:0054 13/31/2020 <br /> Date/Time of Test:7/17/2018/ <br /> TEST INFORMATION <br /> Total number of nozzles: Are the tanks manifolded?F Yes F No <br /> Phase I vapor recovery system executive order(as referenced on Permit to Operate) VR 102 <br /> Phase II vapor recovery system executive order(as referenced on Permit to Operate) VR 202 <br /> Nitrogen introduction point ❑Phase I Vapor Coupler E.Phase II Vapor Riser <br /> Pressure measuring device ❑Incline Manometer C Digital Manometer F Mechanical Gauge <br /> Calibration date for pressure measuring device(must be within 90 days of the test) <br /> Ending value for digital manometer drift test if applicable(must be 0.01 in.w.c.or less) <br /> Initial tank ullage pressure(vent if over 0.5 in w.c.) <br /> Nitrogen introduction flow rate, F(must be between 1 and 5 CFM) <br /> Calculated ullage fill-time,tz 02=V/1522 x F) <br /> Actual fill-time <br /> Number of hoses with over 100 ml(balance hoses must be drained prior to testing) <br /> TANK INFORMATION <br /> Tank No. 1 2 ALL <br /> Product grade 87 91 <br /> Actual tank capacity(gallons) 10028 10028 20056 <br /> Gasoline volume(gallons) 7916 5201 13117 <br /> Ullage,V(gallons) 2112 4827 6939 <br /> If tanks are not manifolded,number of nozzles 0 <br /> 2 IN.W.C.STATIC PRESSURE TEST <br /> Test No. 1 2 5 <br /> Start time 12:00:00 <br /> Initial Pressure, inches of water column(in.w.c.) 2.00 <br /> Pressure at one minute,in.w.c. 1.90 <br /> Pressure at two minutes,in.w.c. 1.77 <br /> Pressure at three minutes,in.w.c. 1.69 <br /> Pressure at four minutes,in.w.c. 1.55 <br /> Pressure at five minutes,in.w.c. 1.41 <br /> Allowable minimum pressure, in.w.c. 1.88 <br /> Pass/Fail(enter"GF"for gross failure) Fail <br /> 1 declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the <br /> statements and information provided inthedocument are true, accurate,and complete. <br /> Signature of Technician: l/J Date:7/17/2018 <br /> WO:2337736 ���ttt Ver. 1.0—12.26.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.