My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 2:29:11 PM
Creation date
9/11/2020 2:54:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.O.# NW1-2337736 <br /> Tanknology Inc. policy 100-29-A <br /> 11000 N.MoPac Expressway,Suite 500 Austin,TX 78759 (800)964-0010 Rev:F <br /> JOB CLEARANCE FORM& Revised:3/05/2018 <br /> SITE SAFETY CHECKLIST—OVF <br /> Wo.n <br /> Site Name* Street Ad resa: <br /> 33 �S4/ Trainva m. parture me: rave me : ate <br /> cope of workand Tasks Performed( s mut be available for all lee e): <br /> spam to u p ent or arts V i <br /> t-oll".U..required;equipment isolated;comments: <br /> PPE-PERSONAL PROTECTIVE QUIPMENT REQrREDCheck✓items used or mark–If t a Ifcable <br /> B'Safety Vest a Safety Glasses oves El Hearing Protection <br /> Steel Toe Boots El Splash Goggles rd Hat ❑ Other <br /> ✓ PRE-TEST PROCEDURES (Check✓each item completed or mark – if not applicable) <br /> 1. 4Discuss safety procedures with site personnel. Nearest hospital: <br /> 2. 17J Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. ;""Secure entire work area with barricades(cones,flags,and extension bars,caution tape,pennant flags,or other perimeter guard). <br /> 4. El"Place fire extinguishers and"No Smoking"signs in the work area. <br /> 5. ❑ Implement LockoutlTagout per API 1646(when accessing product piping during tasks) <br /> ❑ Secure nozzles with"Out of Service'bags and nylon ties. ❑ Secure the circuit breaker(s)with lockout devices and tags. <br /> ❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical"bayonet"connector from the STP(s). <br /> ❑ All applicable equipment disabled during test(s). V rify LOTO is complete by trying to operate pumps. <br /> "SIGN IN" b "` ad Techni ian Name Lead Technician Signature <br /> General Safety Checks: <br /> All site personnel have been informed. <br /> Fuel delivery has been Informed. i resenta' ame Site Representative Signature <br /> Is a fuel delivery due today? <br /> LOTO procedures have been discussed and agreed. QQ{J I,S Q�{ <br /> Work areas barricaded to protect workers,staff&public. I have discussed'ob clearance form with technician. <br /> ✓ POST-TEST PROCEDURES(Check✓each item completed or mark - if not applicable) <br /> 1. ❑ Remove all"Lockout/Tagout"devices. <br /> 2. ❑ Run all pumps and verify there are no leaks: ❑ Impact Valve Test Ports under dispensers <br /> ❑ Leak Detector Threads on STP's ❑ Functional Elements&Relief Screws <br /> 3. ❑ Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: L1_ L2_ L3_ L4— L5_ L6_ <br /> 4. /Check following components operational: ❑ ATG probes,sensors,&caps <br /> ❑ Ball floats,dry breaks&caps ❑ Cathodic protection operational <br /> ❑ Containment sumps are dry ❑ Dispensers&POS operational <br /> O'Dispenser panels are replaced ❑ Drop tubes,fill adapters&caps <br /> ❑ Leak detectors&vent tubes ❑ Manhole covers and sump lids <br /> 'Monitoring system is operational ❑ Shear valves are open <br /> ❑ Siphon lines and manifold valves ❑ Soill containers&drain valves <br /> ❑ STP fittings and bayonet connectors nts(not capped,plugged or isolated) <br /> 5. 0 Remove barricades. <br /> SIGN OUT&Operator Verification of Work(OVF) T nician Name Lead Technician Signature <br /> General Safety Checks: <br /> Work area has been left tidy&safe. <br /> Site staff are aware of work status including any remaining isolation. a Represent tive a e Site Representative Signature <br /> Changes to equipment are documented and communicated. p* <br /> All incidents,near incidents,and unsafe situations reported. L <br /> to Representative omments: <br /> COMPANY CONFIDENTIAL ©Tanknology Inc.,2018.All Rights Reserved. <br /> tinted co ies of this document are uncontrolled.The current version is available in the Tanknolo On-Line Document Conhol S stem, <br />
The URL can be used to link to this page
Your browser does not support the video tag.