My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 2:29:11 PM
Creation date
9/11/2020 2:54:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.O.# NW1-2338028 <br /> Tanknology Inc. <br /> 11000 N.MOPao Expressway,Suite 500 Austin,TX 78759 (800)964-0010 Policy 100-29-A <br /> .IOB CLEARANCE FORM& Rev:F <br /> SITE SAFETY CHECKLIST—OVF Revised:3/05/2018 <br /> Site Name/#: Street Address: tl jp r Pe�lunJ A W.O.R <br /> -r 1��D sll c,- 7-S U�7Z <br /> Arrival Time: Departure Time: Travel Time: others on site: Date <br /> U,-O [.'od -2-7—r <br /> Scope of Work and Tasks Performed(JSA's must be avai lab;e Tor all tasks): <br /> U�rr yr /�sSusc c�ftC <br /> Repairs to Equipment or Parts Provided: <br /> Follow-up actionsrequired;equipment isolated;comments: <br /> Po <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED(Check-items used or mark--if notapplicable) <br /> Safety Vest W- Safety Glasses Gloves ❑ Hearing Protection <br /> Steel Toe Boots ❑ Splash Goggles ❑ Hard Hat ❑ Other <br /> r/ PRE-TEST PROCEDURES Check ✓each item com feted or mark N if notapplicable) <br /> 1. Discuss safety procedures with site personnel. Nearest hospital_ <br /> 2. Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. )l Secure entire work area with barricades(cones,flags,and extension bars,caution tape,pennant flags,or other perimeter guard). <br /> 4. 7 Place fire extinguishers and"No Smoking"signs in the work area. <br /> 5. Implement LockoutlTagout per API 1646(when accessing product piping during tasks) <br /> ❑ Secure nozzles with"Out of Service"bags and nylon ties. ❑ Secure the circuit breaker(s)with lockout devices and tags. <br /> ❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical"bayonet'connector from the STP(s). <br /> ❑ All applicable equipment disabled during test(s). ❑ Verify LOTO is complete by trying to operate pumps. <br /> SIGN IN Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> All site personnel have been informed. O <br /> Fuel delivery has been Informed. Site Representative Name Site Represe f ve Signature e <br /> Is a fuel delivery due today? i <br /> LOTO procedures have been discussed and agreed. <br /> Work areas barricaded to protect workers,staff&public. u ave discussed job clearance form with technician. <br /> ✓ POST-TEST PROCEDURES(Check✓each item completed or mark — if not applicable) <br /> 1. ❑ Remove all"LockoutlTagouf devices, <br /> 2. ❑ Run all pumps and verify there are no leaks: ❑ Impact Valve Test Ports under dispensers <br /> ❑ Leak Detector Threads on STP's ❑ Functional Elements&Relief Screws <br /> 3. ❑ Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: L1_ L2_ L3_ L4_ L5_ L6 <br /> 4. ❑ Check following components operational ❑ ATG probes,sensors,&caps <br /> Ball floats,dry breaks&caps [I Cathodic protection operational <br /> ❑ Containment sumps are dry ❑ Dispensers&POS operational <br /> ❑ Dispenser panels are replaced ❑ Drop tubes,fill adapters&caps <br /> ❑ Leak detectors&vent tubes I] Manhole covers and sump lids <br /> ❑ Monitoring system is operational ❑ Shear valves are open <br /> ❑ Siphon lines and manifold valves ❑ Spill containers&drain valves <br /> / ❑ STP fittings and bayonet connectors El Vents(not capped,plugged or isolated) <br /> 5. I Remove barricades. <br /> SIGN„OUT&Operator Verification of Work(OVF) Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> Work area has been left tidy&safe. ce <br /> Site staff are aware of work status including any remaining isolation. SE a Repr sentati a Name site a Egnalure <br /> Changes to equipment are documented and communicated. ' I I, <br /> All incidents,near incidents,and unsafe situations reported. /��I /4 <br /> Site Representative Comments: <br /> COMPANY CONFIDENTIAL. Q Tanknology Inc.,2018.All Rights Reserved. <br /> Tinted copies of this document are uncontrolled The current version is available in the Tanknology On-Line Document Control System. <br />
The URL can be used to link to this page
Your browser does not support the video tag.