Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM 113age s of s► <br /> X11. LINE LEAK DETECTOR TESTING <br /> ❑X Check this box if line leak detectors (LLD) are NOT Installed. (Do not complete this section.) Y N NA <br /> This section must be completed If LLDs are installed <br /> Was a leak simulated to verify LLD performance? El 1:1 El <br /> all that apply.) Simulated leak rate verified: ❑X 3 GPH El 0. 1 GPH El 0. 2 GPH <br /> Was the testing apparatus property calibrated? ❑ ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? n0❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? El ❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak Is detected? ❑ ❑ ❑ <br /> For electronic LEDs, does the turbine automatically shut off If any portion of the monitoring system Is disabled or disconnected? ❑ I [] I ❑ <br /> For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system malfunctions or fails a test? ❑ ❑ (] <br /> For electronic LLDs, have all accessible wiring connections been visually Inspected for kinks and breaks? ❑ <br /> Were all Items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ ❑ ❑ <br /> For any answer of "N" above, describe in Section X111 how and when these Issues were or will be corrected. <br /> X111. COMMENTS <br /> XIV, VACUUM 1 PRESSURE l HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Q Check this box it VFW monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed If VPH monitoring is used to perform leak detection monitoring, <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail I ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail 1 ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall 1 ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall I ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail 1 ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> How was Interstitial communication verified? Simulated Leak at Far Ends of the interstitial Space n Usual Inspection <br /> Other Describe the method in section XV below.) Gouge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fall" above, describe In Section XV how and when these Issues were or will be corrected. <br /> XV. COMMENTS <br /> i <br /> GPH = Galons Per Hour, Y = Yes, N = No, NA = Not ApOcable, VPH = V ID = Identtbcatian <br /> I <br /> i <br /> i <br />