My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CRESTWOOD
>
2056
>
2300 - Underground Storage Tank Program
>
PR0542283
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 8:47:43 AM
Creation date
9/14/2020 10:51:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0542283
PE
2351
FACILITY_ID
FA0024277
FACILITY_NAME
ARCO AMPM
STREET_NUMBER
2056
STREET_NAME
CRESTWOOD
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2056 CRESTWOOD AVE
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. .. . . . _ . . . . . . . <br /> PAR <br /> DESIGN <br /> Checking for Product Quality: Initial Site Commissioning Recommended Architectural <br /> Practices Solutions Group <br /> Before opening your store, it is appropriate and proper procedure to check your fueling 2455 eer air voeey Rd. suite A-1Cz <br /> equipment to minimize possible product quality issues. This guidance must be followed to soma Rosa. CA. 95404 <br /> ensure that product quality has been maintained, and is acceptable for our customers. <br /> The underlying assumption is that the General Contractor, who was responsible for <br /> building your station, has properly performed their-job and checked that tanks and piping <br /> have been properly installed, tested, cleaned, and labeled at a minimum. Any BP Area ��SED ARChij. <br /> Maintenance Manager, or BP Project Manager, has a checklist showing key points to look <br /> for before accepting a site as "Complete" from the Contractor. Some key areas areas y <br /> follows: - <br /> RBJ. 1 /31 /19 <br /> 1 . Confirm that appropriate product tags have been installed at the fill risers. <br /> ,rr 2Q <br /> 2. Perform a final inspection for the presence of water in the piping to the dispensers by sed 9rFOFCAU��\ <br /> opening the turbine discharge connection at each turbine sump, and <br /> opening/removing the bleeder/test plug on impact valve. Any trapped liquids should <br /> drain back to the turbine sump for removal. M N <br /> An <br /> 3. Confirm that new dispensers are installed with a minimum (meaning a mesh size not % A <br /> greater than) 10 micron filter any factory installed after starup must be discarded in .dA Ytej' <br /> accordance with Used Fuel Filter Waste Management environmental guidelines. <br /> 4. Confirm that proper decals, tax numbers, and other signage required per plans, 1A A I <br /> regulatory requirements, and contractual agreements are installed. <br /> 5. Perform a final inspection for the presence of water within the underground storage <br /> tanks, or in the piping going to the dispensers. Inspection for nater in the tank shall <br /> be performed using Sargel's water finding paste. (or equal) and conducted at both <br /> ends of the tank. If levels of water greater than 1 /4" are detected, proceed with water <br /> elimination procedures, and request that the Contractor do this as part of their scope <br /> of work. <br /> 6. The BP representative (Regional Account Executive or Franchise Consultant) shall <br /> be informed of all major milestones leading up to site start-up. BP reserves the right F <br /> to request copies of inspection reports before initial site start-up, too. m m w <br /> 7. After delivery of the first load of products, each product must be tested and the rrnn �r o <br /> results provided to the BP Area Maintenance Manager and to the BP Project or <br /> or w <br /> Manager, prior to any sale. 0 < y o y rr <br /> Costs of the sampling and analysis are to be included in the Contractor's scope of z z o <br /> work. A laboratory certified to conduct fuels sampling and testing must be used. . 0 —1 z O m of <br /> m < <br /> < n. a <br /> < ¢ a w ¢ <br /> M F_ o- < a y a <br /> N Z U U U m U <br /> r \ m <br /> Q iyS <br /> � � U <br /> 3 <br /> W <br /> I1UI <br /> U <br /> 0 Q <br /> 0 <br /> d <br /> "s <br /> Rm}sa r+umoer <br /> SPA16002 . 0 <br /> a <br /> Sheet Name <br /> X PRODUCTOUALITY: <br /> INITIAL SITE COMMISSIONING <br /> RECOMMENDED PRACTICES <br /> b <br /> b <br /> sheet rrl�nxneer / <br /> C'Io � u uL�1 <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.