My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CRESTWOOD
>
2056
>
2300 - Underground Storage Tank Program
>
PR0542283
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 8:47:43 AM
Creation date
9/14/2020 10:51:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0542283
PE
2351
FACILITY_ID
FA0024277
FACILITY_NAME
ARCO AMPM
STREET_NUMBER
2056
STREET_NAME
CRESTWOOD
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2056 CRESTWOOD AVE
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTICE OF COMPLETION UL <br /> AND <br /> AUTHORIZATION TO APPLY THE UL MARK <br /> July 31, 2018 <br /> MR. DON MUKAI <br /> S BRAVO SYSTEMS INC <br /> 2929 Vail Ave <br /> Commerce, CA 90040-2615 <br /> Our Reference: File MH63042,Vol. 1 Order: 12152825 <br /> Project 4788339507 <br /> Your Reference: 22178 <br /> Project Scope: 4788339507 Sumps and Sump Penetration Fittings <br /> Dear Mr. Mukai: <br /> Congratulations! UL's investigation of your product(s) has been completed under the above Reference Number and <br /> the product was determined to comply with the applicable requirements. This letter temporarily supplements the UL <br /> Follow-Up Services Procedure and serves as authorization to apply the UL Mark at authorized factories under UL's <br /> Follow-Up Service Program. To provide your manufacturer(s)with the intended authorization to use the UL Mark, <br /> you must send a copy of this notice to each manufacturing location currently authorized under File MH63042, Vol. 1. <br /> Records in the Follow-Up Services Procedure covering the product are now being prepared and will be sent in the <br /> near future. Until then, this letter authorizes application of the UL Mark for 90 days from the date indicated above. <br /> Additional requirements related to your responsibilities as the Applicant can be found in the document"Applicant <br /> responsibilities related to Early Authorizations"that can be found at the following web-site: <br /> http://www.ul.com/EAResponsibilities <br /> Any information and documentation provided to you involving UL Mark services are provided on behalf of UL LLC <br /> (UL) or any authorized licensee of UL. <br /> We are excited you are now able to apply the UL Mark to your products and appreciate your business. Feel free to <br /> contact me or any of our Customer Service representatives if you have any questions. <br /> Very truly yours, Reviewed by.- <br /> Timothy <br /> y:Timothy Crews Bruce A. Mahrenholz <br /> Staff Engineer CPO Director <br /> Timothy.A.Crews@ul.com Bruce.A.Mahrenholz@ul.com <br /> c0592c51-7a76-4085-98b0-a2861612b98a <br />
The URL can be used to link to this page
Your browser does not support the video tag.