Laserfiche WebLink
Luri J. Luces, REHS <br /> August 11, 2006 <br /> Page 2 <br /> Further to this, the same contractor will also be applying an acid resistant, 3-pack epoxy <br /> coating system to the secondary containment area. Due to the strict application process, <br /> this will take between 2 and 4 weeks to install depending on ambient temperatures. <br /> During the interim period, the tank will be inspected during every shift. I attach a copy of <br /> details of this work and the coating to be applied. <br /> Due to the high priority that this carries, we would like to request you to provide any <br /> feedback you may have before the system is returned to service on the planned date of <br /> August 17. <br /> Kind regards <br /> Tony Stanbridge <br /> General Manager <br /> Attachments <br /> cc: R. Stilwill —OMI/Thames Water <br /> G. White — OMI/Thames Water <br /> M. Madison — City of Stockton, Department of Municipal Utilities <br />