My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
2121
>
2900 - Site Mitigation Program
>
PR0515580
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:13:15 PM
Creation date
9/14/2020 2:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515580
PE
2960
FACILITY_ID
FA0012230
FACILITY_NAME
MCDONALD ISLAND GAS STORAGE FAC
STREET_NUMBER
2121
STREET_NAME
ZUCKERMAN
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
2121 ZUCKERMAN
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AL ISTO ENGINEERING GROUP LOG OF BORING SB-8 Page , of , <br /> LWAYEr, CALIFORNIA <br /> ALISTO PROJECT NO: 10-211-15-01 DATE DRILLED: 06-27-02 <br /> CLIENT: PG&E BOREHOLE DIAMETER: 4" <br /> SEE SITE PLAN LOCATION:McDonald Island Gas Storage Facility BOREHOLEDEPTH: 14' <br /> FOR BORING LOCATION DRILLING METHOD: Hand auger CASING DIAMETER: 3/4" <br /> DRILLING COMPANY: Alisto Engineering CASING MATERIAL: PVC <br /> LOGGED BY: B. Nagle APROVED BY: Al Sevilla <br /> i <br /> WELL DWGRAM S2 GEOLO= DESCFWTION <br /> J <br /> Base rock <br /> Std Silty SAND, brown, moist; some gravel to 1" diameter. <br /> U 2 <br /> Y <br /> C <br /> 13.1 m 3— Silty SAND; moderate brown, moist. <br /> 4- <br /> 5- <br /> 0.0 <br /> 50.0 = 6 , Color change to light gray. <br /> = <br /> 7- <br /> 8- <br /> 15.1 <br /> 815.1 — 0 9 Very moist to wet ® 9'. <br /> — o <br /> 0 10 Wet ® 10' <br /> — 11 <br /> 12 <br /> 13 <br /> 14 _Some blockgeat organic in SAND at 14'_ _ <br /> Boring terminated at 14'. PVC casing removed before grouting <br /> 15 with neat cement <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.