Laserfiche WebLink
Page 2 of 2 <br /> Precision to mobilize and initiate the program on Monday, but depending on the intensity of the <br /> storm on Tuesday and whether they believe they can negotiate the Pond 3 fill material with the <br /> track-mounted rig, it is possible that they will need to postpone the remainder of the program for <br /> a day or two to allow the fill to dry out. We will keep you informed of the scheduling so that <br /> you may plan your inspection of the piezometer surface completion(s). <br /> Regards, <br /> Robert A. Ellgas, Ph.D. <br /> Program Manager <br /> MSE Group <br /> 302 Pendleton Way <br /> Oakland, CA 94621 <br /> 510-383-9600 <br /> 510-383-9300 fax <br /> 3/18/2008 <br />