My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
2121
>
2900 - Site Mitigation Program
>
PR0515580
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:13:15 PM
Creation date
9/14/2020 2:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515580
PE
2960
FACILITY_ID
FA0012230
FACILITY_NAME
MCDONALD ISLAND GAS STORAGE FAC
STREET_NUMBER
2121
STREET_NAME
ZUCKERMAN
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
2121 ZUCKERMAN
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUSTO ENGINEERING GROUP LOG OF BORING SB-7 Page 1 of , <br /> /-` LAFAYET, CALIFORNIA <br /> ALISTO PROJECT NO: 10-211-15 DATE DRILLED: 06-27-02 <br /> CLIENT. PG&E BOREHOLE DIAMETER: 4" <br /> SEE SITE PLAN LOCATION:McDonald Island Gas Storage Facility BOREHOLE DEPTH: 14' <br /> FOR BORING LOCATION DRILLING METHOD: Hand auger CASING DIAMETER: 3/4" <br /> DRILLING COMPANY: Alisto Engineering CASING MATERIAL: PVC <br /> LOGGED BY: B. Nagle APROVED BY. Al Sevilla <br /> Z <br /> -9 WELL DMOM S 52 GEOLOGIC DESCRFnON <br /> 1z <br /> Imported gravel surface to 6" <br /> a, 1 SM Silty SAND, damp, brown. <br /> c� <br /> U 2 <br /> Y <br /> c <br /> 16.2 m 3- <br /> 4 4 <br /> 5- <br /> 22.1 = 6— Color change to tan ® 5' <br /> 7- <br /> 8- <br /> 10.9 <br /> 810.9 - 0 9 <br /> o , Color change to gray ® 10' <br /> 0 10 Moist to wet at 10 <br /> — 11 <br /> 12- <br /> 13— Dark brown ® 13' <br /> 14 - - - - - - - - - - - - - - - - - - - <br /> Boring terminated at 14'. PVC casing removed before grouting <br /> 15 with neat cement <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> g <br />
The URL can be used to link to this page
Your browser does not support the video tag.