Laserfiche WebLink
i <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page a of B) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ❑X ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, X ❑ ❑ <br /> functionally tested , and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with [9 ❑ <br /> El <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑X ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested , and confirmed operational? Q ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑X ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically O ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? FRI ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ❑X Sump ❑ Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. , modem) operational? N ❑ I ❑ <br /> For any answer of "N" above, describe In Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. ' INJANK GAUGING TESTING <br /> Q Check this box if tank gauging is used only for inventory control , (Do not complete this section) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for FX] ❑ ❑ <br /> round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally FX1 ❑ ❑ <br /> tested , and confirmed operational? <br /> Was accuracy of system's product level readings tested? n ❑ ❑ <br /> Was accuracy of system's water level readings tested? FX] ❑ ❑ <br /> Were all probes reinstalled properly? FX] ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ <br /> For any answer of "N" above, describe in Section X1 how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> i <br />! Y = Yes, N = No, NA = Not Applicable <br />