Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> VI11 . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational ? n ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, E ❑ ❑ <br /> functionally tested , and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their R ❑ ❑ <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? M ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational? ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? EI ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically E ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? [E ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) Q Sump ❑ Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e .g , modem) operational ? El ❑ ❑ <br /> For any answer of "N" above, describe in section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN -TANK GAUGING TESTING <br /> 1 Check this box if tank gauging is used only for inventory control . (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ground ❑ ❑ <br /> faults ? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely , functionally tested , El ❑ ❑ <br /> and confirmed operational ? <br /> Was accuracy of system's product level readings tested ? ❑ ❑ <br /> Was accuracy of system's water level readings tested ? (] ❑ ❑ <br /> Were all probes reinstalled properly? an ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? Eil ❑ ❑ <br /> Foran answer of "N" above, describe in section X1 how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Probes were still tested . <br /> i <br /> l <br /> r <br /> i <br /> S <br /> l,` Y = Yes, N = NO, NA = Not Applicable <br />